Project Details
Title: Long-Term Operations of the Central Valley Project and State Water Project
Tracking Number:
Progress: COMPLETED
Summary: Reclamation has prepared an environmental impact statement (EIS) to describe and analyze alternatives for operation of the Central Valley Project (CVP) to store, release, blend, route and divert water. The EIS will also describe and analyze alternatives for the California Department of Water Resources operation of the State Water Project (SWP) in the Delta for water supply deliveries and flood control, and additional benefits, including power generation and environmental stewardship. The EIS will address the review of the 2019 Biological Opinions required by Executive Order 13990 Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis, and voluntarily reconcile CVP operating criteria with requirements of the SWP under the California Endangered Species Act. Additional information on the project can be found through this link: https://www.usbr.gov/mp/bdo/lto/index.html.
Contact
Phone
Fax
E-Mail
Notes
Tim Warner 916-539-9510 N/A sha-MPR-BDO@usbr.gov
Status
11/15/2024Final EIS Notice of Availability published in the federal register. Public review period ends 12/16/2024.
07/26/2024Draft EIS Notice of Availability published in federal register for public comment.
07/02/2024Notice of Intent and Schedule to prepare EIS are posted.
List of Available Reports
File Report Title File Ext File Size
Final EIS Notice of Availability .pdf 193,626 B
Final EIS Index .pdf 151,695 B
Final EIS - Chapter 0: Executive Summary and TOC .pdf 3,134,250 B
Final EIS - Chapter 1: Introduction .pdf 247,294 B
Final EIS - Chapter 2: Purpose and Need .pdf 377,902 B
Final EIS - Chapter 3: Alternatives .pdf 3,268,543 B
Final EIS - Chapter 4: Water Quality .pdf 1,032,467 B
Final EIS - Chapter 5: Water Supply .pdf 387,873 B
Final EIS - Chapter 6: Groundwater .pdf 540,181 B
Final EIS - Chapter 7: Indian Trust Assets .pdf 300,513 B
Final EIS - Chapter 8: Cultural Resources .pdf 295,410 B
Final EIS - Chapter 9: Air Quality .pdf 438,857 B
Final EIS - Chapter 10: Greenhouse Gas Emissions .pdf 359,128 B
Final EIS - Chapter 11: Visual Resources .pdf 364,129 B
Final EIS - Chapter 12: Fish and Aquatic Resources .pdf 1,116,484 B
Final EIS - Chapter 13: Terrestrial Biological Resources .pdf 328,788 B
Final EIS - Chapter 14: Regional Economics .pdf 465,434 B
Final EIS - Chapter 15: Land Use and Agricultural Resources .pdf 446,752 B
Final EIS - Chapter 16: Recreation .pdf 488,158 B
Final EIS - Chapter 17: Environmental Justice .pdf 369,563 B
Final EIS - Chapter 18: Power .pdf 786,421 B
Final EIS - Chapter 19: Hazards and Hazardous Materials .pdf 286,339 B
Final EIS - Chapter 20: Geology and Soils .pdf 340,945 B
Final EIS - Chapter 21: Public Health and Safety .pdf 393,474 B
Final EIS - Chapter 22: Resources Not Analyzed in Detail .pdf 227,406 B
Final EIS - Chapter 23: Other NEPA Considerations .pdf 266,819 B
Final EIS - Chapter 23 - Attachment 1: Consultation and Coordination .pdf 159,746 B
Final EIS - Appendix A: List of Preparers .pdf 279,414 B
Final EIS - Appendix B: References .pdf 327,688 B
Final EIS - Appendix C: Facilities Descriptions .pdf 3,785,779 B
Final EIS - Appendix D: Mitigation Measures .pdf 637,255 B
Final EIS - Appendix E: Alternatives .pdf 5,630,100 B
Final EIS - Appendix F: Modeling, Part 1 .pdf 6,935,265 B
Final EIS - Appendix F: Modeling, Part 2 .pdf 51,628,018 B
Final EIS - Appendix F: Modeling, Part 3 .pdf 51,473,014 B
Final EIS - Appendix F: Modeling, Part 4 .pdf 38,875,060 B
Final EIS - Appendix F: Modeling, Part 5 .pdf 18,176,743 B
Final EIS - Appendix F: Modeling, Part 6 .pdf 43,363,816 B
Final EIS - Appendix G: Water Quality .pdf 10,150,898 B
Final EIS - Appendix G - Attachment G.1: Electrical Conductivity Modeling Results .pdf 31,530,936 B
Final EIS - Appendix G - Attachment G.2: Chloride Modeling Results .pdf 8,734,662 B
Final EIS - Appendix G - Attachment G.3: Bromide Modeling .pdf 7,358,129 B
Final EIS - Appendix G - Attachment G.4: Methylmercury Modeling Results .pdf 545,166 B
Final EIS - Appendix G - Attachment G.5: Selenium Modeling Results .pdf 5,431,650 B
Final EIS - Appendix G - Attachment G.6: Organic Carbon Modeling Results .pdf 5,819,596 B
Final EIS - Appendix H: Water Supply .pdf 1,827,665 B
Final EIS - Appendix I: Groundwater .pdf 9,632,009 B
Final EIS - Appendix I - Attachment I.1: C2VSimFG Results for Model Subregions .pdf 7,181,220 B
Final EIS - Appendix J: Indian Trust Resources .pdf 380,405 B
Final EIS - Appendix K: Cultural Resources .pdf 492,161 B
Final EIS - Appendix L: Air Quality .pdf 796,151 B
Final EIS - Appendix M: Greenhouse Gas Emissions .pdf 823,181 B
Final EIS - Appendix N: Visual Resources .pdf 694,822 B
Final EIS - Appendix O: Fish and Aquatic Resources .pdf 16,920,484 B
Final EIS - Appendix P: Terrestrial Biological Resources .pdf 1,160,777 B
Final EIS - Appendix Q: Regional Economics .pdf 1,111,785 B
Final EIS - Appendix Q - Attachment Q.1: IMPLAN .pdf 355,182 B
Final EIS - Appendix Q - Attachment Q.2: Cwest .pdf 765,778 B
Final EIS - Appendix Q - Attachment Q.3: SWAP Documentation .pdf 542,648 B
Final EIS - Appendix R: Land Use and Agricultural Resources .pdf 1,996,539 B
Final EIS - Appendix S: Recreation .pdf 2,701,284 B
Final EIS - Appendix T: Environmental Justice .pdf 976,621 B
Final EIS - Appendix U: Power .pdf 1,705,100 B
Final EIS - Appendix U - Attachment U.1: Power Model Documentation .pdf 12,998,176 B
Final EIS - Appendix V: Hazards and Hazardous Materials .pdf 327,002 B
Final EIS - Appendix W: Geology and Soils .pdf 877,344 B
Final EIS - Appendix W - Attachment W.1: Reservoir Storage and Release Figures for No Action and Action Alternatives .pdf 602,234 B
Final EIS - Appendix X: Public Health and Safety .pdf 532,584 B
Final EIS - Appendix Y: Cumulative Impacts .pdf 602,011 B
Final EIS - Appendix Z: Evaluation of Delta Conveyance Project Operations .pdf 734,003 B
Final EIS - Appendix AA: Evaluation of Sites Reservoir Project Operations .pdf 1,529,699 B
Final EIS - Appendix AB - Biological Assessment - Chapter 1: Introduction .pdf 558,321 B
Final EIS - Appendix AB - Biological Assessment - Chapter 2: Environmental Baseline .pdf 837,037 B
Final EIS - Appendix AB - Biological Assessment - Chapter 3: Proposed Action .pdf 3,155,556 B
Final EIS - Appendix AB - Biological Assessment - Chapter 4: Seasonal Operations .pdf 5,868,670 B
Final EIS - Appendix AB - Biological Assessment - Chapter 5: Winter-run Chinook Salmon .pdf 11,128,524 B
Final EIS - Appendix AB - Biological Assessment - Chapter 6: Spring-run Chinook Salmon .pdf 4,849,332 B
Final EIS - Appendix AB - Biological Assessment - Chapter 7: Steelhead .pdf 12,007,068 B
Final EIS - Appendix AB - Biological Assessment - Chapter 8: Green Sturgeon .pdf 1,741,450 B
Final EIS - Appendix AB - Biological Assessment - Chapter 9: Delta Smelt .pdf 2,899,375 B
Final EIS - Appendix AB - Biological Assessment - Chapter 10: Longfin Smelt .pdf 3,002,267 B
Final EIS - Appendix AB - Biological Assessment - Chapter 11: Southern Resident Killer Whale .pdf 779,066 B
Final EIS - Appendix AB - Biological Assessment - Chapter 12: Cumulative Effects .pdf 221,053 B
Final EIS - Appendix AB - Biological Assessment - Chapter 13: Conclusion .pdf 465,399 B
Final EIS - Appendix AB-A: Facilities Description .pdf 6,322,904 B
Final EIS - Appendix AB-A - Attachment A.1: Central Valley Project Public Laws .pdf 124,111 B
Final EIS - Appendix AB-B: Water Operations and Ecosystem Analyses .pdf 5,857,840 B
Final EIS - Appendix AB-C: Species Spatial-Temporal Domains .pdf 8,634,587 B
Final EIS - Appendix AB-D: Seasonal Operations Deconstruction .pdf 3,955,119 B
Final EIS - Appendix AB-E: Exploratory Modeling .pdf 1,091,231 B
Final EIS - Appendix AB-E - Attachment E.1 and E.2: CalSim II Model Assumptions Callouts and Model Results .pdf 3,826,136 B
Final EIS - Appendix AB-F: Modeling, Part 1 .pdf 74,605,579 B
Final EIS - Appendix AB-F: Modeling, Part 2 .pdf 73,760,944 B
Final EIS - Appendix AB-G: Specific Facility and Water Operations Deconstruction .pdf 321,691 B
Final EIS - Appendix AB-H: Conservation Measure Deconstruction .pdf 850,869 B
Final EIS - Appendix AB-I: Old and Middle River Flow Management .pdf 9,935,312 B
Final EIS - Appendix AB-J: Winter and Spring Pulses and Delta Outflow - Smelt, Chinook Salmon, and Steelhead Migration and Survival .pdf 5,879,847 B
Final EIS - Appendix AB-K: Summer and Fall Delta Outflow and Habitat .pdf 12,618,971 B
Final EIS - Appendix AB-L: Shasta Coldwater Pool Management .pdf 2,704,905 B
Final EIS - Appendix AB-M: Folsom Reservoir Flow and Temperature Management .pdf 1,041,850 B
Final EIS - Appendix AB-N: New Melones Stepped Release Plan .pdf 640,863 B
Final EIS - Appendix AB-O: Tributary Habitat Restoration .pdf 4,036,404 B
Final EIS - Appendix AB-P: Delta Habitat .pdf 1,651,792 B
Final EIS - Appendix AC: Long-Term Operations Terrestrial Biological Assessment .pdf 7,532,924 B
Final EIS - Appendix AD: Responses to Comments .pdf 8,716,266 B
Final EIS - Appendix AE: Scoping Report .pdf 540,653 B
Final EIS - Appendix AE: Scoping Report - Attachment A: Scoping Meeting Notification .pdf 373,641 B
Final EIS - Appendix AE: Scoping Report - Attachment B: Scoping Meeting Materials .pdf 2,564,092 B
Final EIS - Appendix AE: Scoping Report - Attachment C: Scoping Comments .pdf 23,480,069 B
Final EIS - Lines of Evidence - Attachment F.1: Maunder Deriso in R Model .pdf 624,170 B
Final EIS - Lines of Evidence - Attachment F.2: CVPIA SIT Winter-Run Life Cycle Model .pdf 5,452,853 B
Final EIS - Lines of Evidence - Attachment F.3: CVPIA SIT Spring-Run Life Cycle Model .pdf 4,676,487 B
Final EIS - Lines of Evidence - Attachment F.4: Delta Smelt Life Cycle Model with Entrainment .pdf 1,940,938 B
Final EIS - Lines of Evidence - Attachment F.5: Interactive Object-oriented Simulation Model .pdf 4,390,635 B
Final EIS - Lines of Evidence - Attachment F.6: Oncorhynchus Bayesian Analysis Model Summary metrics of the OBAN model evaluation of USBR LTO .pdf 745,910 B
Final EIS - Lines of Evidence - Attachment F.7: Change in Abundance Estimate of Central Valley Chinook Salmon Available to Southern Resident Killer Whales .pdf 1,278,083 B
Final EIS - Lines of Evidence - Attachment I.1: Negative Binomial Salvage Model .pdf 1,080,926 B
Final EIS - Lines of Evidence - Attachment I.2: Salvage Density Model Loss Simulation .pdf 4,356,061 B
Final EIS - Lines of Evidence - Attachment I.3: Delta Export ZOI Analysis .pdf 10,725,756 B
Final EIS - Lines of Evidence - Attachment I.4: Longfin Smelt Salvage-OMR Relationship .pdf 964,981 B
Final EIS - Lines of Evidence - Attachment I.5: Survival, Travel Time, and Routing Simulation Model .pdf 3,155,730 B
Final EIS - Lines of Evidence - Attachment I.6: Delta Passage Model: A Simulation Model of Chinook Salmon Survival, Routing, and Travel Time in the Sacramento-San Joaquin Delta .pdf 3,607,532 B
Final EIS - Lines of Evidence - Attachment I.7: ECO PTM .pdf 3,192,719 B
Final EIS - Lines of Evidence - Attachment I.8: Particle Tracking Fate Modeling of Larval Smelt Entrainment .pdf 31,808,835 B
Final EIS - Lines of Evidence - Attachment I.9: Winter-run Chinook Salmon Coded Wire Tag Salvage Model .pdf 1,346,648 B
Final EIS - Lines of Evidence - Attachment I.10: Flow Into Junction Analysis .pdf 4,813,159 B
Final EIS - Lines of Evidence - Attachment I.11: Volumetric Influence Analysis .pdf 1,332,956 B
Final EIS - Lines of Evidence - Attachment J.1: Longfin Smelt Outflow .pdf 2,361,227 B
Final EIS - Lines of Evidence - Attachment J.2: Sturgeon Year Class Index and Delta Outflow .pdf 1,151,095 B
Final EIS - Lines of Evidence - Attachment J.3: Zooplankton-Delta Outflow Analysis .pdf 7,303,381 B
Final EIS - Lines of Evidence - Attachment J.4: XT Model .pdf 2,124,135 B
Final EIS - Lines of Evidence - Attachment J.5: Flow Threshold Salmon Survival Model .pdf 719,417 B
Final EIS - Lines of Evidence - Attachment J.6: Bay-Delta Species Abundance-Delta Outflow Relationships .pdf 986,989 B
Final EIS - Lines of Evidence - Attachment K.1: Summer and Fall Habitat X2 Modeling and Analysis .pdf 16,967,635 B
Final EIS - Lines of Evidence - Attachment L.1: Sacramento River Water Temperature Analysis .pdf 15,918,824 B
Final EIS - Lines of Evidence - Attachment L.2: Egg-to-fry Survival and Temperature-Dependent Mortality .pdf 2,247,043 B
Final EIS - Lines of Evidence - Attachment L.3: Winter-run Chinook Salmon Juvenile Production Index Model .pdf 960,720 B
Final EIS - Lines of Evidence - Attachment L.4: Sacramento River Redd Dewatering Analysis .pdf 2,886,435 B
Final EIS - Lines of Evidence - Attachment L.5: Sacramento River Juvenile Stranding Analysis .pdf 1,162,743 B
Final EIS - Lines of Evidence - Attachment L.6: Coldwater Pool Storage and Exceedance Analysis .pdf 209,374 B
Final EIS - Lines of Evidence - Attachment M.1: American River Redd Dewatering Analysis .pdf 659,803 B
Final EIS - Lines of Evidence - Attachment M.2: American River Water Temperature Analysis .pdf 7,128,155 B
Final EIS - Lines of Evidence - Attachment M.3: American River Weighted Usable Area Analysis .pdf 537,484 B
Final EIS - Lines of Evidence - Attachment N.1: Stanislaus River Water Temperature Analysis .pdf 4,567,356 B
Final EIS - Lines of Evidence - Attachment N.2: Stanislaus River Habitat Availability Analysis .pdf 1,123,062 B
Final EIS - Lines of Evidence - Attachment O.1: Clear Creek Weighted Usable Area Analysis .pdf 563,023 B
Final EIS - Lines of Evidence - Attachment O.2: CVPIA SIT LCM Habitat Estimates .pdf 6,897,930 B
Final EIS - Lines of Evidence - Attachment O.3: Sacramento River Weighted Usable Area Analysis .pdf 2,175,569 B
Draft EIS Notice of Availability .pdf 174,900 B
Long-Term Operations Draft Environmental Impact Statement (Chapters 0 - 23) .pdf 9,368,445 B
Draft EIS - Chapter 23-Attachment 1: Consultation and Coordination .pdf 146,551 B
Draft EIS - Appendix A: List of Preparers .pdf 263,939 B
Draft EIS - Appendix B: EIS References .pdf 320,954 B
Draft EIS - Appendix C: Facilities Descriptions .pdf 3,618,180 B
Draft EIS - Appendix D: Mitigation Measures .pdf 559,997 B
Draft EIS - Appendix E: Alternatives .pdf 4,130,875 B
Draft EIS - Appendix E-Attachment 1: Clifton Court Forebay Expansion Sensitivity Analysis .pdf 259,468 B
Draft EIS - Appendix F: Modeling - Part 1 .pdf 73,289,697 B
Draft EIS - Appendix F: Modeling - Part 2 .pdf 82,480,956 B
Draft EIS - Appendix G: Water Quality .pdf 5,406,575 B
Draft EIS - Appendix G-Attachment 1: Electrical Conductivity .pdf 21,845,657 B
Draft EIS - Appendix G-Attachment 2: Chloride .pdf 6,166,751 B
Draft EIS - Appendix G-Attachment 3: Bromide .pdf 6,317,871 B
Draft EIS - Appendix G-Attachment 4: Mercury .pdf 644,153 B
Draft EIS - Appendix G-Attachment 5: Selenium .pdf 5,091,989 B
Draft EIS - Appendix G-Attachment 6: Dissolved Organic Carbon .pdf 4,786,523 B
Draft EIS - Appendix H: Water Supply .pdf 1,038,576 B
Draft EIS - Appendix I: Groundwater .pdf 9,791,679 B
Draft EIS - Appendix I-Attachment 1: C2VSimFG Results for Model Subregions .pdf 7,068,826 B
Draft EIS - Appendix J: Indian Trust Assets .pdf 511,612 B
Draft EIS - Appendix K: Cultural Resources .pdf 1,135,139 B
Draft EIS - Appendix L: Air Quality .pdf 566,458 B
Draft EIS - Appendix M: Greenhouse Gas Emissions .pdf 715,755 B
Draft EIS - Appendix N: Visual Resources .pdf 624,404 B
Draft EIS - Appendix O: Fish and Aquatic Resources .pdf 17,072,265 B
Draft EIS - Appendix P: Terrestrial Biological Resources .pdf 1,863,071 B
Draft EIS - Appendix Q: Regional Economics .pdf 1,131,985 B
Draft EIS - Appendix Q-Attachment 1: IMPLAN .pdf 355,182 B
Draft EIS - Appendix Q-Attachment 2: Cwest .pdf 765,778 B
Draft EIS - Appendix Q-Attachment 3: SWAP Documentation .pdf 542,648 B
Draft EIS - Appendix R: Land Use .pdf 1,122,145 B
Draft EIS - Appendix S: Recreation .pdf 2,501,087 B
Draft EIS - Appendix T: Environmental Justice .pdf 673,608 B
Draft EIS - Appendix U: Power .pdf 1,049,244 B
Draft EIS - Appendix U-Attachment 1: Power Model Documentation .pdf 7,288,266 B
Draft EIS - Appendix V: Hazards .pdf 525,972 B
Draft EIS - Appendix W: Geology .pdf 1,620,353 B
Draft EIS - Appendix W-Attachment 1: Figures .pdf 149,575 B
Draft EIS - Appendix X: Public Health and Safety .pdf 720,590 B
Draft EIS - Appendix Y: Cumulative Impacts .pdf 561,085 B
Draft EIS - Appendix Z: Delta Conveyance Project Operations .pdf 1,429,621 B
Draft EIS - Appendix AA: Sites .pdf 1,448,496 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 1: Introduction .pdf 626,093 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 2: Environmental Baseline .pdf 813,592 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 3: Proposed Action .pdf 2,886,096 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 4: Seasonal Operations .pdf 6,455,359 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 5: Winter-run Chinook Salmon .pdf 7,128,546 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 6: Spring-run Chinook Salmon .pdf 5,858,803 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 7: Steelhead .pdf 7,727,513 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 8: Green Sturgeon .pdf 1,052,549 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 9: Delta Smelt .pdf 2,962,315 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 10: Longfin Smelt .pdf 2,836,461 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 11: Killer Whale .pdf 1,226,914 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 12: Cumulative Effects .pdf 252,583 B
Draft EIS - Appendix AB - Biological Assessment - Chapter 13: Conclusion .pdf 658,249 B
Draft EIS - Appendix AB-A: Facilities Description .pdf 9,669,617 B
Draft EIS - Appendix AB-B: Water Operations and Ecosystem Analyses .pdf 5,556,899 B
Draft EIS - Appendix AB-C: Species Spatial-Temporal Domains .pdf 9,684,885 B
Draft EIS - Appendix AB-D: Seasonal Operations Deconstruction .pdf 2,237,647 B
Draft EIS - Appendix AB-E: Exploratory Modeling .pdf 1,199,758 B
Draft EIS - Appendix AB-E - Attachment 1: CalSim II Model Assumptions Callouts .pdf 4,164,509 B
Draft EIS - Appendix AB-F: Numerical Modeling Part 1 .pdf 74,526,102 B
Draft EIS - Appendix AB-F: Numerical Modeling Part 2 .pdf 73,678,461 B
Draft EIS - Appendix AB-G: Specific Facility and Water Operations Deconstruction .pdf 352,562 B
Draft EIS - Appendix AB-H: Conservation Measures Deconstruction .pdf 591,619 B
Draft EIS - Appendix AB-I: Old and Middle River Flow Management .pdf 5,078,497 B
Draft EIS - Appendix AB-J: Winter and Spring Pulses and Delta Outflow: Smelt, Chinook Salmon, and Steelhead Migration and Survival .pdf 11,120,854 B
Draft EIS - Appendix AB-K: Summer and Fall Delta Outflow and Habitat .pdf 8,846,004 B
Draft EIS - Appendix AB-L: Shasta Coldwater Pool Management .pdf 1,280,282 B
Draft EIS - Appendix AB-M: Folsom Reservoir Flow and Temperature Management .pdf 575,554 B
Draft EIS - Appendix AB-N: New Melones Stepped Release Plan .pdf 407,863 B
Draft EIS - Appendix AB-O: Tributary Habitat Restoration .pdf 1,692,815 B
Draft EIS - Appendix AB-P: Delta Habitat .pdf 1,536,831 B
Draft EIS - Appendix AC - Terrestrial Biological Assessment .pdf 7,437,564 B
Draft EIS - Lines of Evidence - Attachment F.1: Maunder Deriso in R Model .pdf 506,879 B
Draft EIS - Lines of Evidence - Attachment F.2: CVPIA SIT Winter-Run Life Cycle Model .pdf 6,963,902 B
Draft EIS - Lines of Evidence - Attachment F.3: CVPIA SIT Spring-Run Life Cycle Model .pdf 7,864,012 B
Draft EIS - Lines of Evidence - Attachment F.4: Delta Smelt Life Cycle Model .pdf 2,714,142 B
Draft EIS - Lines of Evidence - Attachment F.5: Interactive Object-oriented Simulation Model .pdf 3,625,218 B
Draft EIS - Lines of Evidence - Attachment F.6: Oncorhynchus Bayesian Analysis Model .pdf 751,518 B
Draft EIS - Lines of Evidence - Attachment F.7: Change in Abundance Estimate of Central Valley Chinook Salmon Available to Southern Resident Killer Whales .pdf 1,528,463 B
Draft EIS - Lines of Evidence - Attachment I.1: Negative Binomial Salvage Model .pdf 1,363,969 B
Draft EIS - Lines of Evidence - Attachment I.2: Salvage Density Model Loss Simulation .pdf 2,966,918 B
Draft EIS - Lines of Evidence - Attachment I.3: Delta Export ZOI Analysis .pdf 10,903,453 B
Draft EIS - Lines of Evidence - Attachment I.4: Longfin Smelt Salvage-OMR Relationship .pdf 1,266,683 B
Draft EIS - Lines of Evidence - Attachment I.5: Survival, Travel Time, and Routing Simulation Model .pdf 4,000,337 B
Draft EIS - Lines of Evidence - Attachment I.6: Delta Passage Model: A Simulation Model of Chinook Salmon Survival, Routing, and Travel Time in the Sacramento-San Joaquin Delta .pdf 3,318,615 B
Draft EIS - Lines of Evidence - Attachment I.7: ECO PTM .pdf 3,606,275 B
Draft EIS - Lines of Evidence - Attachment I.8: Particle Tracking Fate Modeling of Larval Smelt Entrainment .pdf 24,495,523 B
Draft EIS - Lines of Evidence - Attachment I.9: Winter-Run Chinook Salmon Coded Wire Tag Salvage Model .pdf 2,464,786 B
Draft EIS - Lines of Evidence - Attachment I.10: Flow Into Junction Analysis .pdf 4,833,234 B
Draft EIS - Lines of Evidence - Attachment J.1: Longfin Smelt Outflow .pdf 2,224,509 B
Draft EIS - Lines of Evidence - Attachment J.2: Sturgeon Year Class Index and Delta Outflow .pdf 714,679 B
Draft EIS - Lines of Evidence - Attachment J.3: Zooplankton-Delta Outflow Analysis .pdf 4,851,665 B
Draft EIS - Lines of Evidence - Attachment J.4: XT Model .pdf 1,556,164 B
Draft EIS - Lines of Evidence - Attachment J.5: Flow Threshold Salmon Survival Model .pdf 609,495 B
Draft EIS - Lines of Evidence - Attachment J.6: Bay-Delta Species Abundance-Delta Outflow Relationships .pdf 582,762 B
Draft EIS - Lines of Evidence - Attachment K.1: Summer and Fall Habitat X2 Modeling and Analysis .pdf 16,999,372 B
Draft EIS - Lines of Evidence - Attachment L.1: Sacramento River Water Temperature Analysis .pdf 19,830,328 B
Draft EIS - Lines of Evidence - Attachment L.2: Egg-to-fry Survival and Temperature-Dependent Mortality .pdf 3,005,176 B
Draft EIS - Lines of Evidence - Attachment L.3: Winter-run Chinook Salmon Juvenile Production Index Model .pdf 800,315 B
Draft EIS - Lines of Evidence - Attachment L.4: Sacramento River Redd Dewatering Analysis .pdf 2,748,659 B
Draft EIS - Lines of Evidence - Attachment L.5: Sacramento River Juvenile Stranding Analysis .pdf 1,115,736 B
Draft EIS - Lines of Evidence - Attachment M.1: American River Redd Dewatering Analysis .pdf 645,896 B
Draft EIS - Lines of Evidence - Attachment M.2: American River Water Temperature Analysis .pdf 7,409,078 B
Draft EIS - Lines of Evidence - Attachment M.3: American River Weighted Usable Area Analysis .pdf 528,133 B
Draft EIS - Lines of Evidence - Attachment N.1: Stanislaus River Water Temperature Analysis .pdf 4,968,765 B
Draft EIS - Lines of Evidence - Attachment N.2: Stanislaus River Habitat Availability Analysis .pdf 2,144,786 B
Draft EIS - Lines of Evidence - Attachment O.1: Clear Creek Weighted Usable Area Analysis .pdf 1,447,968 B
Draft EIS - Lines of Evidence - Attachment O.2: CVPIA SIT LCM Habitat Estimates .pdf 16,439,058 B
Draft EIS - Lines of Evidence - Attachment O.3: Sacramento River Weighted Usable Area Analysis .pdf 2,401,984 B
Long-Term Operation of the CVP and SWP, EIS Schedule .pdf 78,564 B
Long-Term Operation of the CVP and SWP, Notice of Intent .pdf 217,551 B