Mission Statement-Milestone Report

To obtain a copy of the documents below please contact Katrina Chow at (916) 978-5067, or customer assistance at (916) 335-6227.

  • 01 - Cover
  • 02 - Executive Summary
  • 03 - Table of Contents
  • 04 - Chapter 1 - Introduction
  • 05 - Chapter 2 - Related Studies, Projects, and Programs
  • 06 - Chapter 3 - Without-Project Conditions
  • 07 - Chapter 4 - Water and Related Resources Problems and Needs
  • 08 - Chapter 5 - Plan Formulations Approach
  • 09 - Chapter 6 - Potential Initial Plans
  • 10 - Chapter 7 - Study Management and Public Involvement
  • 11 - Chapter 8 - Future Actions
  • 12 - Chapter 9 - Summary of Findings
  • 13 - Appendix A - Supplemental Information for Existing Conditions
  • 14 - Appendix B - Reservoir Area Inventory Office Report (Included as separate document)
  • 15 - Appendix C - Strategic Agency and Public Involvement Plan

Plates

  • 01 - Primary Study Area
  • 02 - Shasta Reservoir Area
  • 03 - CVP and SWP Facilities
  • 04 - Shasta Elevations and Sections
  • 05 - Shasta Dam and Powerplant Plan
  • 06 - Capacity Relationship
  • 07 - Shasta Recreation Features
  • 08 - Pit River Bridge
  • 09 - Flood Frequency at Keswick
  • 10 - Flood Frequency at Bend Bridge
  • 11 - Shasta Dam Flood Control Diagram
  • 12 - Shasta Monthly Releases
  • 13 - Shasta Enlargement Option-Plan
  • Complete Document

 

Note: Documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view, download Adobe Acrobat Reader

Last Updated: 12/7/17