- Reclamation
- MP Region
- Area Offices
- NCAO
- SLWRI
- Documents
- Initial Alternatives Information Report
Initial Alternatives Information Report
To obtain a copy of the documents below please contact Katrina Chow at (916) 978-5067, or customer assistance at (916) 335-6227.
- 01 - Cover
- 02 - Executive Summary
- 03 - Table of Contents
- 04 - Chapter 1, Introduction
- 05 - Chapter 2, Related Studies, Projects, and Programs
- 06 - Chapter 3, Without-Project Conditions
- 07 - Chapter 4, Water and Related Resources Problems and Needs
- 08 - Chapter 5, Plan Formulations Approach
- 09 - Chapter 6, Resources Management Measures
- 10 - Chapter 7, Concept Plans
- 11 - Chapter 8, Comparison of Concept Plans
- 12 - Chapter 9, Special Topics
- 13 - Chapter 10, Study Management and Public Involvement
- 14 - Chapter 11, Future Actions
- 15 - Chapter 12, Summary of Findings
- Complete Report
Plates
- 01 Primary Study Area
- 02 Shasta Reservoir Area
- 03 Major CVP and SWP Facilities
- 04 Shasta Elevations and Sections
- 05 Shasta Dam and Powerplant Plan
- 06 Capacity Relationships
- 07 Shasta Recreation Facilities
- 08 Pit River Bridge
- 09 Peak Rain Flood Frequency Sacramento River at Keswick Regulation Condition
- 10 Peak Rain Flood Frequency Sacramento River Above Bend Bridge Regulated Condition
- 11 Shasta Dam Flood Control Diagram
- 12 Shasta Reservoir Storage Monthly Average
- 13 Maximum Inundatiion Limits Lakeshore Area without Infrastructure Protection
- 14 McCloud River - Extent of Maximum Inundation
- 15 Maximum Area of Inundation - 100-foot and 200-foot Shasta Dam Enlargement Options
- 16 Simulated Shasta Reservoir Storage Fluctuations - Baseline & Dam Raise Scenarios
- 17 Increase Water Supply Reliability with 6.5-foot Shasta Enlargement Plan (WSR-1)
- 18 Increase/Enhance Water Supply Reliability with 18.5-foot Shasta Enlargement Plans (WSR-2 and 4)
- 19 Increase Anadromous Fish Habitat and Water Supply Reliability with 18.5-foot Shasta Enlargement (CO-2)
- 20 Multipurpose with 18.5-foot Shasta Enlargement Plan (CO-5)
- All Plates
Appendices
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E - Part 1
- Appendix E - Part 2
- Appendix E - Part 3
- Appendix E - Part 4
- Appendix E - Part 5
Supplemental Documents
- Assessment of Potential of Shasta Dam Reoperation for Flood Control and Water Supply Improvement
- Break-Point Analysis
- Ecosystem Restoration Opportunities in the Upper Sacramento River Region
- Shasta Reservoir Area Inventory
- Strategic Agency and Public Involvement Plan
- Technical Memorandum No. SHA-8130-TM-98-1
- Mission Statement Milestone Report
- Mission Statement Milestone Report - Plate 1
- Mission Statement Milestone Report - Plate 2
- Mission Statement Milestone Report - Plate 3
- Mission Statement Milestone Report - Plate 4
- Mission Statement Milestone Report - Plate 5
- Mission Statement Milestone Report - Plate 6
- Mission Statement Milestone Report - Plate 7
- Mission Statement Milestone Report - Plate 8
- Mission Statement Milestone Report - Plate 9
- Mission Statement Milestone Report - Plate 10
- Mission Statement Milestone Report - Plate 11
- Mission Statement Milestone Report - Plate 12
- Mission Statement Milestone Report - Plate 13
- Mission Statement Milestone Report - Appendix A
- Mission Statement Milestone Report - Appendix B
- Mission Statement Milestone Report - Appendix C
Note: Documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view, download Adobe Acrobat Reader