Pacific Northwest Region Rope Access Team Photos

Click on each image for a larger image.
rope picture
Jim Dean and Sonja Norton from the PN Region preparing to descend the downstream face of Clear Creek Dam in central Washington. Doug Bennett is on the rope in the background. The job consisted of cleaning and repositioning monitoring targets on the downstream face.
rope picture
Jim Dean from the PN Region descending the downstream face of Clear Creek Dam with Sonja Norton assisting.
rope picture
Jim Dean and Sonja Norton from the PN Region performing an inspection of the Palisades Dam spillway tunnel located in southeastern Idaho. 
rope picture 
Jim Dean and Sonja Norton from the PN Region performing an inspection of the Palisades Dam spillway tunnel located in southeastern Idaho. 
rope picture
Jim Dean and Sonja Norton from the PN Region performing an inspection of the Palisades Dam spillway tunnel located in southeastern Idaho.
rope picture
Sonja Norton from the PN Region practicing from the Arrowrock Dam Spillway Bridge.
rope picture
Erin Bell from the PN Region practicing from the Arrowrock Dam Spillway Bridge.
rope picture 
Sonja Norton from the PN Region beginning a rope-to-rope transfer below the Arrowrock Dam Spillway Bridge.
rope picture
Sonja Norton from the PN Region ascending  from the Arrowrock Dam spillway chute to the spillway bridge.

 

 

Last Updated: 3/1/18