Annual Workplan - 2010

All documents in PDF format

2010 Annual Workplan
Program Title View
01 Anadromous Fish Restoration Program (AFRP) 3406(b)(1) (85 KB)
02 Habitat Restoration Program 3406(b)(1) "other" (117 KB)
03 Trinity River Restoration Program 3406(b)(1) "other"/(b)23 (205 KB)
04 Identification of the Instream Flow Requirements for Anadromous Fish in the Streams
Within the Central Valley of California - CVPIA
3406(b)(1)(B) (126 KB)
05 Dedicated Project Yield 3406(b)(2) (1.1 MB)
06 Water Acquisition Program 3406(b)(3)+(d)(2)+(g) (1.1 MB)
07 Tracy (Jones) Pumping Plant Mitigation Program 3406(b)(4) (170 KB)
08 Contra Costa Canal Pumping Plant Mitigation Program Section 3406(b)(5) Contra Costa
Canal Intake Fish Screening Project
3406(b)(5) (118 KB)
09 Flow Fluctuation and Reservoir Storage 3406(b)(9)+3406(19) (96 KB)
10 Red Bluff Diversion Dam Fish Passage Program (Fish Passage Planning Program) 3406(b)(10) (161 KB)
11 Clear Creek Restoration Program 3406(b)(12) (137 KB)
12 Spawning and Rearing Habitat Restoration Program 3406(b)(13) (142 KB)
13 Comprehensive Assessment and Monitoring Program (CAMP) 3406(b)(16) (177 KB)
14 Anadromous Fish Screen Program (AFSP) 3406(b)(21) (125 KB)
15 San Joaquin River Comprehensive Plan 3406(c)(1) (94 KB)
16 Refuge Water Conveyance (Wheeling) Program 3406(d)(1), (2), (5) (166 KB)
17 Refuge Facilities Construction Program and San Joaquin Basin Action Plan 3406(d)(5) (180 KB)
18 Ecosystem and Water Systems Operations Models 3406(g) (126 KB)
19 Land Retirement Program 3408(h) (112 KB)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view download Adobe Acrobat Reader.

Last Updated: 1/7/21