- Reclamation
- California-Great Basin
- CVP
- CVPIA
- 3404(c) CVP Contract Renewal Process
- Environmental Documentation - Draft EA/FONSI
Draft Environmental Assessments/Findings of No Significant Impact
- Draft Supplemental Environmental Assessment and Draft FONSI for 2006 Renewal of Interim Water Service Contracts for the Central Valley Project | Press Release MP-06-007
- Draft FONSI for the City of Lindsay, 2004 (PDF - 183 KB)
- Draft FONSI for the City of Fresno, 2004 (PDF - 183 KB)
- Draft EA/FONSI for the Article 5 Exchanges for the Cross Valley Central Valley Project Contractors with Others | Press Release MP-05-011
- Draft EA/FONSI for the San Joaquin Valley National Cemetery Long-Term Water Service Contract | Press Release MP-05-002
- Draft Environmental Assessment and Draft FONSI for the Pajaro Valley Water Management Agency, the Westlands Water Distribution District No. 1, and the Santa Clara Valley Water District | Press Release MP-05-001
- Supplemental Draft Environmental Assessment and Draft FONSI for the Cross Valley Canal Contractors | Press Release MP-04-113
- Revised Draft Environmental Assessment and Draft FONSI for Contra Costa Water District | Press Release MP-04-101
- Delta-Mendota Canal Unit Draft EA and FONSI | Press Release MP-04-090
- Environmental Documents Available for Renewal of CVP Long-Term Water Service Contacts | Fresno | Lindsay | Press Release MP-04-66
- Draft Updated Environmental Assessment and Draft Finding of No Significant Impact for the Renewal of the Long-Term Water Service Contracts for the Shasta and Trinity River Divisions Contractors | Press Release MP-04-63
- Draft Environmental Assessment and Draft Finding of No Significant Impact for the Feather Water District
- Draft Revised Enivironmental Assessment and Draft Finding of No Significant Impact for the Sacramento River Division | Press Release MP-04-54
- Draft Environmental Assessment for the 2004 Renewal of Interim Water Service Contracts:
- Draft Finding of No Significant Impact (through February 28, 2006) (PDF - 62 KB | DOCX - 456 KB)
- Draft Addendum - To Interim Renewal Contract Proposed Action/Project Description, December 2003 (PDF - 18 KB | DOCX - 36 KB)
- Draft Supplemental Environmental Assessment for the 2004 Renewal of Interim Water Service Contracts through February 28, 2006, Central Valley Project, California, December 2003 (PDF - 88 KB | DOCX - 475 KB)
- Draft Appendix A: Form Contract 12/12/03 (PDF - 17 KB | DOCX - 38 KB)
- Draft Appendix B: Existing Interim Renewal Contract Sample (PDF - 1.4 MB)
- Appendix C: Supplemental Environmental Assessment for the 2002 Renewal of Interim Water Service Contracts through February 29, 2004, Central Valley Project, California, February 2002 (PDF - 58 KB | DOCX - 254 KB)
- Appendix A: 2002 Interim Contract Sample (PDF - 13 KB | DOCX 28 KB)
- Appendix B: Final 2001 Supplemental EA (PDF - 7.3 MB)
- Appendix C: Interim Contract Renewal Biological Opinion Status Report (PDF - 35 KB | DOCX - 65 KB)
- Appendix D: Responses to Comments on the Draft 2002 Supplemental EA (PDF - 2.2 MB)
- Appendix E: National Marine Fisheries Service Concurrence Letter (PDF - 156 KB)
- Appendix F: U.S. Fish and Wildlife Service Biological Opinion (PDF - 704 KB)
- Draft Appendix D: Maps showing the Existing Habitat and Service Area Location for 17 Interim Renewal Contractors shown on Table 1 (PDF - 8.9 MB)
- Draft Appendix E: Summaries of Existing Habitat and Habitat Change Since 1993 fFor Each 2004 Interim Renewal Contractor (split into two files) (PDF - 540 KB | PDF - 565 KB)
- Draft Appendix F: Summary Status Report On The Conservation Actions Included In The 2000 Biological Opinion (PDF - 51 KB | DOCX - 112 KB)
Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view download Adobe Acrobat Reader.