Auburn-Folsom South Unit Special Report
- Auburn-Folsom South Unit Special Report, Benefits and Cost Update (PDF - 4 MB)
- Appendix A - Technical Memorandum, Project Description Review (PDF - 18 KB)
- Appendix B - Technical Memorandum, Water Supply, Power, and Water Temperature Analysis, May 30, 2006 (PDF - 312 KB)
- Appendix C - Technical Memorandum Economic Benefits Update, May 2006 (PDF - 2.1 MB)
- Appendix D - Office Report (US Army Corps of Engineers) (PDF - 107 KB)
- Appendix E - Update of Cost + Appendix A: Technical Documents Consulted (PDF - 2 MB)
- Appendix B - Cost Estimate Calculation Worksheets (PDF - 10.7 MB)
- Appendix C - Updated Cost Estimates (PDF - 1.36 MB)
- Appendix D - Risk Analysis Workbooks (PDF - 2.2 MB)