Schedule of Proposed NEPA Actions

NOTE: This report contains the most accurate information available at time of publication.

Browse by Office:

 

Regional Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
 

 

Dakotas Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Fort Berthold Rural Water System (FBRWS) Projects EA Fort Berthold Indian Reservation, North Dakota Complete, EA and FONSI signed January 22, 2024  Fort Berthold Rural Water  Ashley Persinger
(701) 221-1282
apersinger@usbr.gov
Additional Information: Fort Berthold Rural Water System (FBRWS) Projects
 
Eastern North Dakota Alternate Water Supply (ENDAWS) EIS Central North Dakota Complete, EIS and ROD signed January 15, 2021 Garrison Diversion Conservancy District on behalf of the State of North Dakota Ashley Persinger
(701) 221-1282
apersinger@usbr.gov
Additional Information: Eastern North Dakota Alternate Water Supply
 
Belle Fourche RMP Belle Fourche, South Dakota Complete, FONSI Issued January 2024 South Dakota Game, Fish, and Parks Department Andrea Gue
(701) 221-1223
ague@usbr.gov
Additional Information: https://www.usbr.gov/gp/dkao/nepa/belle/index.html
 
Heart Butte Dam EA Heart Butte Dam Draft EA is available for public comment November 18 - December 20, 2024 Reclamation Ashley Persinger
(701) 221-1282
apersinger@usbr.gov
Project Activities: Reclamation is preparing an Environmental Assessment for the funding and construction of a Safety of Dams Modification Project for Heart Butte Dam. The selected design alternative includes conduit joint repair, a seepage cutoff system, and a seepage blanket filtration system constructed at the downstream toe of the dam. Construction is expected to require up to two years and a reduction of Lake Tschida to the minimum water elevation of 2,030 feet. The reduction in reservoir elevation is necessary to reduce the water table in the vicinity of the project and to reduce the potential for uncontrolled spillway flow during the construction period.

Additional Information:

Heart Butte Dam Notice to the Public
 

 

Eastern Colorado Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Town of Estes Park Long-Term Water Service Contract Colorado-Big Thompson Project Complete, FONSI Issued October 2019 Town of Estes Park Terence Stroh
970-461-5469
tstroh@usbr.gov
Project Activities: Eastern Colorado Area Office has prepared an EA that analyzed environmental effects of renewing the 40-year water service contract with the Town of Estes Park to deliver Colorado-Big Thompson water through C-BT system above Estes Park. The EA also analyzed a change in delivery from the Mary's Lake Penstocks to Lake Estes, and exchanges between Lake Estes and the Big Thompson River just below its confluence with Glacier Creek.

Additional Information: Final Environmental Assessment for Town of Estes Park Long-Term Water Service Contract

 
Upper Thompson Sanitation District Water Reclamation Facility and Lift Station Improvement Project Estes Valley, Colorado Complete, FONSI Issued December 2024 Upper Thompson Sanitation District Matt Schultz
970-461-5469
mjschultz@usbr.gov
Project Activities: Eastern Colorado Area Office has prepared an EA that analyzed environmental effects associated with constructing, operating and maintaining of a new waste water treatment facility, two lift stations and connecting pipelines.

Additional Information: Upper Thompson Sanitation District Water Reclamation Facility and Lift Station Improvement Project Final Environmental Assessment

 
Walker Recharge Project WaterSmart Grant South Platte River, Colorado Complete, FONSI Issued April 2019 Central Colorado Water Conservancy District Terence Stroh
970-461-5469
tstroh@usbr.gov
Additional Information: Walker Recharge Project WaterSmart Grant site
 
Triview Metropolitan District Fry-Ark Project Excess Capacity Contract Environmental Assessment South-Central Colorado Complete, FONSI Issued October 2021 Triview Metropolitan District Terence Stroh
970-461-5469
tstroh@usbr.gov
Additional Information: Triview Site
 
Arkansas Valley Conduit Fryingpan-Arkansas Project, Arkansas River Basin, Colorado Complete, FONSI Issued February 2022 Southeast Colorado Water Conservancy District Terence Stroh
970-461-5469
tstroh@usbr.gov
Additional Information: AVC Site
 
Narrows Lantz Tract Recharge Project Lantz Tract, Narrows Project, Ft. Morgan, Colorado Complete, FONSI Issued January 2024 Ducks Unlimited, Bijou Irrigation District, and Colorado Parks and Wildlife Patrick McCusker
970-461-5442
pmccusker@usbr.gov
Additional Information:

Narrows Lantz Tract Recharge Project Draft EA

 

 

Montana Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
 
Fresno Safety of Dams (EA) Havre, Montana Early Internal Scoping Planning Initiated MRJBOC, Montana FWP

David Trimpe
(406) 247-7330
dtrimpe@usbr.gov
and
Lauri Teig
(406) 247-7668
lteig@usbr.gov

Additional Information: Fresno Dam requires safety of dams modifications beginning in 2018/2019.

 

 

Nebraska-Kansas Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Medicine Creek Reservoir Resource Management Plan/NEPA Documentation Frontier County, Nebraska Initializing Project/Conducting additional surveys November 2017 Nebraska Game and Parks Commission Nik Johanson
(308) 345-1032
njohanson@usbr.gov
and
Jeanette Timm
(308) 345-1028
jtimm@usbr.gov

Additional Information: Bureau of Reclamation has initialized a contract to update the Resource Management Plan for Medicine Creek Reservoir. NEPA analysis will accompany the plan.

 
Bonny Reservoir Resource Management Plan/NEPA Documentation Yuma County, Colorado Drafting RMP/EA scheduled for public review Nov 2018 November 2017 Colorado Parks and Wildlife Nik Johanson
(308) 345-1032
njohanson@usbr.gov
and
Jeanette Timm
(308) 345-1028
jtimm@usbr.gov

Additional Information: Bureau of Reclamation has initialized a contract to update the Resource Management Plan for Bonny Reservoir. NEPA analysis will accompany the plan.

 

 

Oklahoma-Texas Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
 

 

Wyoming Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Buffalo Bill State Park RMP/EA Shoshone Project, Wyoming, Buffalo Bill Reservoir Final FONSI and EA/RMP September 17, 2024 Bureau of Reclamation, Wyoming State Parks, Ayres and Associates, Logan Simpson Joseph G. Felgenhauer
(406) 247-7746
jgfelgenhauer@usbr.gov
Additional Information: Buffalo Bill State Park FONSI and EA/RMP

Fort Laramie Tunnel Rehabilitation EA Wyoming and Nebraska Drafting EA; scheduled for public review Jan. 7, 2025

Jan. 7 to Feb. 7, 2025

Bureau of Reclamation, Wyoming State Parks, Ayres and Associates, Logan Simpson Stacey Johnson
(307) 261-5631
sjohnson@usbr.gov
Additional Information:

 

Regional Archive (NEPA Complete)

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Northwest Area Water Supply Project (EIS) Northwest North Dakota ROD was issued in 2015; U.S. District Court, Washington DC issued an order finding the NEPA was sufficient in 2017. Province of Manitoba, Canada and State of Missouri appealed. The United States and Manitoba reached a settlement in 2018. Oral arguments in the Missouri appeal were held in November 2018 and in May 2019 the U.S. Court of Appeals for the District of Columbia Circuit affirmed the judgement of the District Court. Project sponsor is moving ahead with design/construction of project features.   State of North Dakota is the project sponsor. Alicia Waters
(701) 221-1206
awaters@usbr.gov
Additional Information:
Tittle Transfer of Single Purpose Facilities Norman Project/Environmental Assessment Norman Project, Oklahoma FONSI and Final EA FONSI signed May 23, 2019 Bureau of Reclamation/ Central Oklahoma Master Conservancy District Precious Braggs
(405) 470-4825
pbraggs@usbr.gov

Additional Information: The Central Oklahoma Master Conservancy District, Reclamation’s Project Partner, has requested title transfer for certain land and appurtenances located within the Norman Project. Reclamation is currently collecting data and performing pre-scoping activities.

Finding of No Significant Impact and Final EA - Proposed Title Transfer of Single Purpose Municipal Water Supply Assets

 
Twin Buttes Transportation Management Plan (TMP)/Environmental Assessment (EA) San Angelo Project, Texas FONSI and Final EA FONSI signed May 17, 2019 Bureau of Reclamation Trent Parish
(512) 899-4157
jparish@usbr.gov
Additional Information: Reclamation contracted the US Forest Service, via an Interagency Agreement to complete a Transportation Management Plan (TMP) for Twin Buttes Reservoir and Programmatic EA. Anticipated date of completion is 4/30/2019
 
Crow MR&I Water System (EA) Crow Indian Reservation, Montana Final EA/FONSI Complete January 2017 Crow Tribe, Water Resources Department Joey e'Silva
(406) 247-7720
jesilva@usbr.gov
Additional Information: Crow MR&I Water System
 
Environmental Assessment for the Funding and Construction of the Heart Butte Conduit Repair, Grant County, North Dakota Grant County, North Dakota Final EA/FONSI Complete April 2018   Kate Kenninger
701-221-1282
kkenninger@usbr.gov
Additional Information: Reclamation is evaluating the environmental impacts associated with proposed repairs to Heart Butte Dam.
 
Boysen Reservoir Resource Management Plan/Environmental Assessment and FONSI Fremont County, Wyoming Completed FONSI signed March 6, 2018 Wyoming State Parks Brad Cannon
(307) 261-5635
bcannon@usbr.gov
and
Laura Schwieger
(307) 261-5664
lschwieger@usbr.gov
Additional Information: Wyoming State Parks, Reclamation's managing partner for Boysen Reservoir, has contracted for the preparation of a Recreation Master Plan / Resource Management Plan and Environmental Assessment. Document was completed and the FONSI was signed 3/6/18.
 
Arkansas Valley Conduit Fryingpan-Arkansas Project, Arkansas River Basin in Southeastern Colorado Complete: Record of Decision Feb 2014 Southeastern Colorado Water Conservancy District Terry Stroh
970-461-5469
tstroh@usbr.gov

Additional Information: More information on AVC and the status of the project can be found at: https://www.usbr.gov/avceis/

 
Southern Delivery System Fryingpan-Arkansas Project, Arkansas River and Foutain Creek River Basins, CO Complete: Record of Decision Mar 2009 Colorado Springs Utilities Terry Stroh
970-461-5469
tstroh@usbr.gov
Additional Information: SDS contract and Phase I construction complete and in operation as of 2016. Phase II (construction of Gary M. Bostrom and Williams Creek Reservoirs) anticipated in mid-2020s.
 
Windy Gap Firming Project Colorado-Big Thompson Project, Colorado and South Platte River Basins Complete: Record of Decision Dec 2014 Municipal Subdistrict of the Northern Colorado Water Conservancy District Terry Stroh
970-461-5469
tstroh@usbr.gov
Additional Information: Record of Decision issued in December 2014. Construction of Chimney Hollow Reservoir anticipated in the mid-2020s. More information can be found at: https://www.usbr.gov/gp/ecao/nepa/windy_gap.html
 
Last Updated: 12/18/24