Website change notification: To simplify finding documents from the Interior Region 7 – Upper Colorado Basin, items currently housed in the Environmental Document web pages will be moved to a more inclusive Document Library.
The current pages will remain active as the transition to the new organization and navigation take place. Eventually the old navigation button and pages will be decommissioned, therefore if you have these pages bookmarked, please be sure to update them to reflect the new Document Library address.

Plans & Reports

Back to Quick Nav  Back to Quick Nav 
Annual Reports to the Pecos River Commission
Publication Date Document Title
2018 Calendar Year 2018 Report to the Pecos River Commission Link is to a PDF file
2017 Calendar Year 2017 Report to the Pecos River Commission Link is to a PDF file

For more information about Annual Reports to the Pecos River Commission, please contact ResourceMgr@usbr.gov

Back to Quick Nav  Back to Quick Nav  Back to Quick Nav  Back to Quick Nav  Back to Quick Nav 
Miscellaneous Plans & Reports
Publication Date Document Title
11/2019 Level II Historic Resource Documentation Gould Canal Segments 5DT2146.1 and 5MN10747.4 Montrose and Delta Counties, Colorado
07/2019 Crawford Clipper Ditch Company: Level II Historic Resource Documentation of the Crawford Clipper Ditch—Spurlin Mesa Lateral (5DT1811.6), Delta County, Colorado
02/2019 Zero Liquid Discharge Demonstration Project Final Report Link is to a PDF file
02/2019 Peer Review and Information Quality Plan for the Paradox Valley Environmental Impact Statement Link is to a PDF file
01/2019 Environmental Evaluation - The Allowance of the Installation of Sixteen Boat Slips at the Navajo Lake Marina, Navajo Unit, New Mexico - Supplemental Information Report Link is to a PDF file
12/2018 Paradox Valley Unit 2nd Well Design Final Report Link is to a PDF file
12/2018 Isleta to San Acacia Hydraulic and Geomorphic Analysis Link is to a PDF file
08/2018 Angostura Dam to Montaño Bridge: Geomorphic and Hydraulic Analysis Link is to a PDF file
08/2017 Enviromental Evaluation: The Allowance of the Installation of Four Finger Docks at the Navajo Dam Marina Link is to a PDF file
01/2015 San Juan River Water Quality before, during and after the Gold King Mine Spill Link is to a PDF file
04/2013 Geomorphic Assessment of the Rio Grande Upstream of Elephant Butte Reservoir Link is to a PDF file
04/2012 Middle Rio Grande River Maintenance Comprehensive Plan and Guide Link is to a PDF file
03/2012 Determining Large Flood Events on the Paria River for a Rapid Response Alternative High Flow Experiment Link is to a PDF file
09/2011 San Juan-Chama Project Integrated Pest Management Plan (2011-2015) Link is to a PDF file
09/2011 Jordanelle Reservoir Resource Management Plan Link is to a PDF file
02/2010 Report to Congress - Utilization of Power Revenues for Annual Base Funding of the Upper Colorado River and San Juan River Basin Recovery Implementation Programs Link is to a PDF file
01/2010 Upper Colorado Region Prevention and Rapid Response Plan for Dreissenid Mussels Link is to a PDF file
02/2009 Interior Least Tern Monitoring Results 2008 Link is to a PDF file
12/2008 Post-Runoff Field Review, Middle Rio Grande Project Link is to a PDF file
12/2006 Interior Least Tern Monitoring Results Link is to a PDF file
03/2006 River Survey on the Rio Blanco Link is to a PDF file
02/2006 Lower Pecos River Waterfowl and Wildlife Areas Management Plan for The Brantley Project Mitigation Lands 2005-2010 Link is to a PDF file
02/2006 Accuracy of Hec-Ras to Calculate Flow Depths and Total Energy Loss with and without Bendway Weirs in a Meander Bend Link is to a PDF file
02/2006 Evolution of the Bends at RM 110 Link is to a PDF file
01/2006 Progress Report 2005 - Contributions to Delisting Rio Grande Silvery Minnow: Egg Habitat Identification Link is to a PDF file
01/2006 Geologic Site Assessment for LA-854 Mesilla, New Mexico Link is to a PDF file
2006 Recent Channel Incision and Floodplain Evolution within the Middle Rio Grande, New Mexico Link is to a PDF file
2006 Channel Widths Changes Along the Middle Rio Grande, New Mexico Link is to a PDF file
2006 The Implications of Recent Floodplain Evolution on Habitat within the Middle Rio Grande, New Mexico Link is to a PDF file
12/2005 Rio Grande Geomorphology Summary of The Bernalillo Bridge Reach - Final Report 2005 Link is to a PDF file
12/2005 Geomorphology Summary, Rio-Grande - Corrales Reach Link is to a PDF file
12/2005 2005 Bank Erosion Monitoring Report - San Acacia Reach of the Riod Grande, New Mexico Link is to a PDF file
10/2005 Sediment Plug Computer Modeling Study Tiffany Junction Reach Link is to a PDF file
04/2005 Analyzing Changes in River Channel Morphology Using GIS for Rio Grande Silvery Minnow Habitat Assessment Link is to a PDF file
04/2005 Habitat Framentation and Modifications Affecting Distribution of the Rio Grande Silvery Minnow Link is to a PDF file
04/2005 San Ildefonso Pueblo River Maintenance Priority Site Geomorphic Trends Assessment Link is to a PDF file
03/2005 San Acacia River Mile 111 Priority Site - Bend Migration Assessment Link is to a PDF file
2005 Bernalillo River Maintenance Priority Site Bend Migration Monitoring Spring 2005 Link is to a PDF file
11/2004 Rio Grande River Maintenance Priority Sites on the Pueblo of Cochiti Link is to a PDF file
10/2004 Physical Features and Fish Distribution of a Steep Riffle, Rio Grande-Bernalillo Bridge Reach Link is to a PDF file
09/2004 Appendix C - Current Fluvial Conditions Rio Grande-Bernalillo Bridge Reach Link is to a PDF file
09/2004 Fort Craig Post Cemetary Report Link is to a PDF file
09/2004 Report of Skeletal Remains Excavated at Fort Craig Post Cemetary Link is to a PDF file
09/2004 Progress Report 2004 - Contributions to Delisting Rio Grande Silvery Minnow: Egg Habitat Identification Link is to a PDF file
09/2004 Design Improvement Constructed Rio Grande Silvery Minnow Nursery Habitat Link is to a PDF file
08/2004 San Acacia River Mile 114 and 113 Priority Site - Bend Migration Estimates Link is to a PDF file
2004 Geology of Salazar Pit Area Link is to a PDF file
08/2003 Corrales Reach - Corrales Flood Channel to Montano Bridge Hydraulic Modeling Analysis 1962-2001 Link is to a PDF file
07/2003 Preliminary Geomorphic Assessment of the Bernalillo-Albuquerque Reach, Middle Rio Grande near Albuquerque, New Mexico Link is to a PDF file
07/2003 Preliminary Geomorphic Assessment of the Bernalillo-Albuquerque Reach, Middle Rio Grande near Albuquerque, New Mexico Link is to a PDF file
06/2003 Appendix A - Bernalillo Bridge Reach Hwy 550 Bridge (old Hwy 44) to Corrales Flood Channel Hydraulic Modeling Analysis 1962-2001 Link is to a PDF file
06/2003 Geomorphic Assessment of the Rio Grande San Acacia Reach Link is to a PDF file
08/2002 Rio Grande in the Los Lunas Habitat Restoration Area Link is to a PDF file
08/1967 San Juan-Chama Project, Colorado-New Mexico Definite Plan Report Link is to a PDF file
Back to Quick Nav 

You may email questions regarding environmental documents to ucbpao@usbr.gov

Last updated 4/15/22