- Reclamation
- Projects & Facilities
- Projects
- Animas-La Plata Project
Animas-La Plata Project
State: Colorado
Region: Upper Colorado Basin Region
Related Documents
ALP OM Contract
Environmental Commitment Checklist: 2009 Update
Animas-La Plata Project/Colorado Ute Indian Water Rights Settlement
Related Facilities
Related Links
Animas La Plata Project
ALP Environmental Commitment and Monitoring Plan
ALP - Final Supplemental Environmental Impact Statement
Durango Pumping Plant
Animas La Plata Operation, Maintenance, and Replacement Association
Project Map
City of Durango - Lake Nighthorse Recreation
Reclamation's Upper Colorado Region Water Operations
Reclamation Water Information System
Overview
The Animas-La Plata Project located in La Plata and Montezuma Counties in southwestern Colorado and in San Juan County in northwestern New Mexico, was authorized by the Colorado River Basin Project Act of September 30, 1968. In 1988, it was incorporated into the Colorado Ute Indian Water Rights Settlement Act. The Colorado Ute Settlement Act Amendments of 2000 provide for implementation and completion of the project. Approval to begin construction was granted in October 2001 and initial site work began in April 2002.
Lake Nighthorse began filling on May 4, 2009, and filled for the first time on June 29, 2011. The maximum water surface elevation of 6,882 feet equates to 123,541 acre-feet in storage.
General
The Animas-La Plata Project located in La Plata and Montezuma Counties in southwestern Colorado and in San Juan County in northwestern New Mexico, was authorized by the Colorado River Basin Project Act of September 30, 1968. In 1988, it was incorporated into the Colorado Ute Indian Water Rights Settlement Act. The Colorado Ute Settlement Act Amendments of 2000 provide for implementation and completion of the project. Approval to begin construction was granted in October 2001 and initial site work began in April 2002.
Lake Nighthorse began filling on May 4, 2009, and filled for the first time on June 29, 2011. The maximum water surface elevation of 6,882 feet equates to 123,541 acre-feet in storage.
History
The Animas-La Plata Project, located in southwestern Colorado and northwestern New Mexico, has been the subject of substantial public interest and environmental review since it was authorized. Following is a short history leading to the initiation of project construction, and current construction progress.
1968 - United States Congress authorized construction of the A-LP Project
1980 - The Bureau of Reclamation released a Final Environmental Statement on the project.
1988 - Congress passed the Colorado Ute Indian Water Rights Settlement Act which authorized the implementation of a 1986 water rights settlement agreement.
1990 - Based on new biological information, the U.S. Fish and Wildlife Service issued a draft biological opinion concluding that the project would jeopardize the continued existence of the Colorado pikeminnow.
1991 - The Service issued a Final Biological Opinion containing a reasonable and prudent alternative that limited the project depletions to 57,100 acre-feet per year. This opinion allowed construction of the project to begin.
1992 - A lawsuit filed by environmental organizations halted construction of the project.
1996 - Reclamation released a Final Supplement to the Final Environmental Statement, that addressed updated environmental information.
1996-97 - Supporters and opponents of the project addressed unresolved issues associated with the original A-LP Project to gain consensus on an alternative to the project. (Romer/Schoettler Process)
1998 - The Department of the Interior recommended construction of a substantially scaled-down project that was designed to satisfy the intent of Colorado Ute Tribes' 1986 water rights settlement agreement.
2000 - Reclamation released a Final Supplemental Environmental Impact Statement and Record of Decision that identified the selected alternative as a down-sized project that focused on providing the Colorado Ute Tribes, as well as others, an assured water supply. Congress authorized construction of the scaled-down project with the Colorado Ute Settlement Act Amendments of 2000.
2001 - November 9, 2001, Reclamation Commissioner grants approval to initiate project construction.
2002 - Construction began with installation of the Inlet Conduit Sleeve.
2003 - Update of Project Construction Cost Estimate reveals increase of project cost from approximately $338 million to $500 million. Ridges Basin Dam Outlet Works excavation was completed. Durango Pumping Plant excavation was initiated.
2004 - Construction continued on Ridges Basin Dam foundation excavation with over two million cubic yards of material excavated. DPP excavation, Intake Structure, and fish bypass were substantially completed. Preliminary design for the Navajo Nation Municipal Pipeline continued.
2005 - Construction was initiated on the DPP structure. Erection of an onsite Sky Ute Sand and Gravel concrete batch plant at the DPP site was completed and brought into production. The main pumping plant bay foundation and first floor concrete were completed. The floor of the intake channel/fish screen was completed. The pipes to and from the pumps were installed and were encased in concrete. Ridges Basin Dam Completion Contract was awarded in March. Foundation grouting on the foundation and both abutments was initiated. Placement of the zone materials (including sand and filter drains, impervious clay core, and Zone 4 shell) continued. The materials processing plant was erected and produced Zone 2 (sand), Zone 3 (gravel), Zone 6 (rock), and road base materials. On August 12, 2005, the Ridges Basin Dam Zone One Clay Placement Ceremony was held. During the ceremony, religious leaders of the Colorado Ute Indian Tribes blessed the building of the dam. The outlet works tunnel and gate chamber was excavated and concrete invert tunnel lining was initiated. Construction of Basin Creek Drop Structures was initiated.
2006 - Construction continued on the DPP Approximately 20,000 cubic yards of concrete were placed through the end of 2006 at the intake fish screen, plant, and air chamber structures. Installation, at the pumping plant site, of a portion of the 72-inch buried steel pipeline (Ridges Basin Inlet Conduit) was initiated and completed. Ridges Basin Dam construction continued. Approximately three million cubic yards of embankment zoned fill material were placed bringing the dam elevation to an average height of 6,783 feet. Grouting operations continued through this season on the dam abutments and in the outlet works tunnel. The materials processing plant continued in full production until winter shutdown. The outlet works tunnel upstream reinforced concrete lining and down stream arch lining were completed. Concrete lining in the gate chamber was initiated in late fall. The intake tower was completed to elevation 6,760 feet. Construction of Basin Creek Drop Structures were completed.
2007 - Construction on the DPP is 78 percent complete. The DPP structure was completed using a total of 21,300 cubic yards of concrete and the roof was installed. The fish screen was installed in the intake structure and the air chamber for the 72-inch inlet conduit was completed. Ridges Basin Dam was topped out at an elevation of 6,893 feet. At the outlet works the gate chamber was completed and a 4 x 6 foot slide gate was installed. A 66-inch steel outlet pipe was installed in the downstream arch tunnel and the access walkways were completed. Construction of the control house started and a 60-inch jet flow and sleeve valve gate was installed.
2008 - General construction of Ridges Basin Dam and Inlet Conduit, Durango Pumping Plant, and appurtenant structures of the Animas-La Plata Project were completed. In September 2008, the first two major contracts were awarded for work on the Navajo Nation Municipal Pipeline marking the start of construction on the fourth major component of the project.
2009 - The first fill of Lake Nighthorse commenced May 4, 2009. Significant progress was made on construction of the Navajo Nation Municipal Pipeline portion of the project by the Navajo Engineering and Construction Authority.
2010 - Construction continued on the Navajo nation Municipal Pipeline and the permanent operating facility for the project. First fill of the reservoir continued reaching 50 percent of capacity when pumping ended in June. The project sponsors formed the Animas-La Plata Operations, Maintenance and Replacement Association to assume operational responsibility for the Colorado project features.
2011 - Lake Nighthorse filled the first time on June 29, 2011, with 123,541 acre-feet of water storage. In May, a three-week flow test of the Basin Creek Improvements was conducted to test the series of channel improvements and small check dams, or drop structures to convey water released from Ridges Basin Dam down Basin Creek to the Animas River without increasing, or decreasing, the sediment transport to the river.
2012 - The Bureau of Reclamation, Animas-La Plata Water Conservancy District, and community of Durango developed a Recreation Master Plan for Lake Nighthorse and completed the National Environmental Policy Act compliance review. The area in and around Lake Nighthorse would not be opened for public use until a recreation management entity could be identified and appropriate recreation facilities constructed. Pipe laying operations on the Navajo Nation Municipal Pipeline were completed in July.
2013 - The Colorado project features were transferred from construction status to operation and maintenance status in March 2013. Work continued on connections to existing distribution systems.
Construction
No text for this section
Plan
No text for this section
Other
No text for this section
Contact
Owner
Title: Western Colorado Area Office - Grand JunctionOrganization: Western Colorado Area Office
Address: 445 W. Gunnison Ave., Suite 221
City: Grand Junction, CO 81506
Phone: 970-248-0600
Operator
Title: Animas-La Plata OperationOrganization: Maintenance and Replacement Association
Address: 125 Smelter Place
City: Durango
Phone: 970-385-7158