General
The Silt Project is located in west-central Colorado near the towns of Rifle and Silt. The project stores the flows of Rifle Creek and pumps water from the Colorado River to supply irrigation waer for approximately 7,000 acres of land. Principal features of the project are Rifle Gap Dam and Reservoir, a pumping plant, and a lateral system. Recreation facilities are available at Rifle Gap Reservoir.
History
Most early settlers in the area were miners and prospectors who turned to irrigated agriculture after being unsuccessful in mining attempts. In 1920, 40 families were brought from New York by the Midland Railroad Company to operate coal mines in the Silt area. When the railroad failed a short time later, the families remained in the vicinity and began farming. Agriculture is still the region`s basic industry. Several thousand acres of rangeland and National Forest reserves surround the cultivated areas and are used for summer grazing. Most irrigated farmland is devoted to the production of alfalfa, grain, and native hay for livestock feed; a small acreage is used for production of fruit and truck crops.
Construction
The construction contract for Rifle Gap Dam was awarded in August 1964 and the project was completed in 1967. Major crops are alfalfa, small grain, and hay for livestock feed. Recreation at Rifle Gap Reservoir (http://www.recreation.gov/detail.cfm?ID=60) is administered by the Colorado Division of Parks and Outdoor Recreation and consists of camping, picnicking, swimming, boating, and fishing. In 1996, 12-hour visitor days totaled 123,112. Although there is no specific reservoir capacity assigned for flood control, the Silt Project has provided an accumulated $150,000 in flood control benefits from 1950 to 1999. When one thinks of Reclamation one tends to think of the big projects. While this may be the common perception of Reclamation, it is not necessarily the correct one. The little projects Reclamation constructed, like the Silt Project, may not be more than a blip on most people`s mental map, but to the local water users they mean everything. The little projects promote and maintain the Jeffersonian ideal, that of the small family farmer with a plot of land to call his or her own, the foundation of the reasons for the creation of the Reclamation Service. Projects like Silt harken back to the roots of an organization that went on to build several of the engineering marvels of the twentieth century, including Hoover, Shasta, and Grand Coulee Dams. The Silt Project is located on the Western Slope of Colorado in Garfield County, near the towns of Rifle and Silt. Comprised of the Rifle Gap Dam, the resulting Rifle Gap Reservoir, a lateral system, and the Silt Pumping Plant, the project sits on Rifle Creek. Rifle Creek, formed by the confluence of the East, Middle, and West Rifle Creeks immediately north of the Grand Hogback, provides the principal source of Project water. Rifle Creek cuts through the Hogback at Rifle Gap and flows into the Colorado River near the town of Rifle. The bulk of the Project lands occupy the area between the Colorado River and the Grand Hogback, a prominent ridge four to six miles north of the river in the vicinity of the Project, on Harvey and Davie Mesas. In addition, Dry Elk Valley, immediately north of the Grand Hogback, contains a smaller body of Project land. Low precipitation, fairly long cold winters, and short moderately warm summers, characterize the climate in the vicinity of the Project. Due to the variation of temperature and precipitation associated with elevation, the lower valleys and mesas are warmer and drier than the adjoining mountain areas. The average elevation is 5,760 feet on Harvey and Davie Mesas and 6,285 feet in Dry Elk Valley.(1) Though no physical evidence remained archeologists believe, based on evidence left by later civilizations, that the first settlements on the Western Slope occurred between 10,000 to 5,500 B.C.; these Paleo-Indians left no trace of their existence and their presence in Garfield County is purely speculation. Had these civilization existed on the Western Slope they would have been characterized by a reliance on big game hunting. The first known settlements occurred after 5,500 B.C. Archeologists speculate that the next major civilization, the Ute Indians, entered Colorado and the Western Slope between 1200 and 1400 A.D. The Utes depended on hunting and gathering for their livelihood; small groups traveled in a pattern based on seasonal use of natural resources. They relied on the bow and arrow to hunt as well as the use and manufacture of ceramics. The Utes inhabited the region until 1881 when they were relocated to reservations in northeastern Utah.(2) In 1776, two Franciscan friars, Francisco Garces and Francisco Silvestre Velez de Escalante, set out from Santa Fe, New Mexico, in search of an overland route to Monterey, California. In the process they `discovered` the Colorado River, traveling as far north as the Gunnison River Valley and Elk Mountain Range in the north central reaches of Colorado`s Western Slope, just south and slightly east of the Project area. The next major explorer to investigate the Western Slope was Major John Wesley Powell, from 1868-1869. While exploring the Colorado River, Powell spent the winter along the White River, which runs north of the Project. Ten years later, in 1879, Powell published hisReports on the Lands West of the Arid Region of the United States. The Reports outlined Powell`s observations about the lands west of the 100th Meridian, including his belief that without the development of irrigation works farming in the region remained an impossibility. Powell`s conclusions enticed few settlers to the region which remained scarcely populated. George B. Chittenden, while exploring north of the town of Silt in the late 1800s, christened Cactus Valley, located between the Colorado and the Grand Hogback, because a `thick carpeting of prickly -pears and other low-growing cacti` characterized the area. It was to this valley that later farmers diverted water to irrigate their crops. Unlike the nearby `boomtown` mining communities of Leadville and Aspen, the communities of Silt, Rifle, and Parachute were founded by homesteaders who became ranchers, farmers, and fruit growers.(3) Oftentimes these settlers, former miners and prospectors, came from Leadville, Kokoma, and Aspen.(4) Due to the scarcity of water, the early settlers cultivated only enough land to feed their families. Economic activities centered around raising cattle because of the ready availability of forage in the nearby timber and alpine meadows. The towns of New Castle and Rifle bracket Silt to the east and west. Silt developed in its present location because it was halfway between the two towns, seven miles in either direction. In spring a traveler could make it the seven miles between the towns in a day on muddy roads.(5) The town of Rifle took its name from the nearby Rifle Creek. The Creek, and by extension the town, were named by Austin Corcoran while guiding a survey party in the area. After discovering a rusty `Henry` rifle while near the creek, Corcoran dubbed the tributary, Rifle Creek. Corcoran went on to become one of the first famous `cowboy poets.`(6) Powell`s vision of irrigated farming in the arid west proved to be prophetic in the region around the Project. Beginning in 1887, with the Grass Valley Land & Water Corporation (Corporation), the history of the area became inextricably tied to the human construction and natural destruction of irrigation works. The first organized efforts toward large scale irrigation works in the area began in 1887, with formation of the Grass Valley Land & Water Corporation financed by English investors. Closure of the Colorado silver mines in 1893, after the devastating panic of 1893, prompted many miners and their families to move to the valley situated between Silt and Rifle. The influx of settlers made the availability of water an even more pressing problem, thus enticing the Corporation to construct the Grass Valley Reservoir at Harvey Gap. Completed in 1894 the reservoir washed out in April 1895. Unable to fund reconstruction of the reservoir, the Corporation soon failed. Failure of the Corporation did not signal the end of irrigation efforts in the valley. Prior to construction of a reservoir, in 1890, farmers began work on the Cactus Valley Ditch. They completed the Ditch in 1898 and would provide water to local farmers for decades to come. The Farmers Irrigation Company (Company), incorporated in 1903, for the purpose of rebuilding the reservoir. Though only able to make the reservoir 28-feet deep, the Company was off to a good beginning, which reflected in the farmer`s production. New Castle became known as Peach Valley because of its prolific peach orchards. Farmers from the region made a spectacular showing at the St. Louis World`s Fair in 1904. W.S. Parks, from Silt, won first prize with his peaches and apples. William Johnson won with his potatoes. The Coe and Fleming Ranch won prizes for its fruit while, John Hasley grew the largest sugar beet shown at the Fair. In 1907, the Antlers Orchard and Development Company enlarged the Reservoir; in the meantime the Grass Valley Land & Water Corporation had been bought by other investors. Water releases from the newly enlarged reservoir allowed alfalfa to bloom in spots previously decorated by sagebrush.(7) In 1920, The Midland Railroad Company brought forty families to the area to operate coal mines in the vicinity of Silt, Colorado. A short time later, the railroad failed, yet the families remained, turning to farming to support themselves.(8) After farming, mining ranks as the major industry in the area; for a short time it even became the most important economic enterprise. Beginning with the original attempts to mine minerals in the area, a mining presence peacefully coexisted with the agricultural endeavors. Failed miners easily adapted themselves to the local economy and took up farming. Mining`s importance in the region shifted drastically in the early 1980s, when Exxon U.S.A. moved into the region and began developing the multibillion dollar oil shale industry. The greatest concentration of oil shale reserves in the free world lies in the Piceance Creek Basin, an area west of the Project. Exxon`s presence drastically impacted the local economy, turning the small towns of Silt, Rifle, and Parachute into typical western boomtowns overnight. The sleepy agricultural based communities overnight turned into mining meccas of the West. Just as quickly, the brief shining light that was oil shale development faded, leaving local residents to fend for themselves in the aftermath.(9) For the most part, agriculture has been the mainstay of the region since the first Anglo settlements in the early 1880s. Furthermore, irrigation has been necessary to ensure economic success. Oftentimes irrigation demands exceeded stream flows in late summer allowing the sun to wither crops while the farmers stood helplessly by. In 1891, attempting to relieve the problem, the farmers built the Harvey Gap Dam and dug canals to the fields. The resulting Harvey Gap Reservoir, too small to accommodate all of the farmers in the vicinity, prompted the development of the Silt Project. It was not until development of the Colorado River Storage Project (CRSP) with its plan to share revenues from large hydroplants with irrigation projects that funding became available for the Project.(10) The Bureau of Reclamation began investigations of the Silt Project in 1936. Ten years later, in 1946, a report on the Colorado River briefly described a project plan similar to the present one. In 1951, a supplement to the 1950 report on CRSP including participating projects, located within the five adjacent states of Arizona, Colorado, New Mexico, Utah, and Wyoming, detailed plans for the Silt Project. A 1953, amendment to the CRSP report became the basis for authorization of the Silt Project. Congress authorized the Colorado River Storage Project with the Act of April 11, 1956--initial units included Glen Canyon, Flaming Gorge, Curecanti(11), Navajo, and eleven other projects. This act included authorization of the Silt Project, one of the initial group of participating projects in CRSP. Project purposes included the diversion, storage, and distribution of water of the Rifle Creek watershed and the Colorado River for irrigation, fish and wildlife, and recreation. The authorized Project included, the rehabilitation of the previously abandoned Davie Ditch, as well as the construction of the Rifle Gap Dam and Reservoir, the Silt Pumping Plant, and a lateral system.(12) Reclamation initiated construction on the Silt Project in March 1964, with the appointment of Frank D. Carlson as construction engineer; Carlson transferred from the Seedskadee Project, Fontenelle, Wyoming. On March 16, Reclamation established a temporary construction office in house number seventeen, at Anvil Points, a Bureau of Mines housing area nine miles west of Rifle. A permanent office was established on May 4, 1964, at 125 West Third Street, in Rifle. Two days later, Reclamation issued an invitation for bids for the Rifle Gap Dam and road relocation. Reclamation actually issued the first construction contract prior to establishment of the permanent project office. The initial construction contract was for a laboratory and field office building at Rifle Gap Dam. Reclamation opened bids on April 28, 1964. Lee Johnson Construction Company of Rifle submitted the low bid, and Reclamation awarded the contract on May 8. The contractor erected a twenty-four foot by sixty foot prefabricated Armco building complete with plumbing, heating, and electrical systems on a concrete slab. Reclamation accepted the completed building on October 12, 1964. Prior to the start of construction, provisions were made with the Silt Water Conservancy District (SWCD) whereby they would assume title to the building when Reclamation finished construction. In the meantime, on June 23, 1964, Reclamation opened bids for construction of Rifle Gap Dam and road relocation. Northwestern Engineering Company, located in Commerce City, Colorado, submitted the low bid; despite their claim that an error was made in the preparation of their bid making their bid too low, Reclamation awarded them the contract on August 1, 1964 at the original bid price. The contractor received notice to proceed on August 12. Site construction activities began early in August 1964. An average crew of about twenty-five men worked steadily throughout the year. Prior to striping vegetation and unsuitable materials from the valley floor portion of the dam embankment, the contractor diverted East Rifle Creek into West Rifle Creek above the dam embankment area. Stripping of the vegetation proceeded simultaneously with excavation for the cutoff trench. Placement of the dam embankment began in October, however due to winter weather the contractor suspended operations in November. As equipment schedules and weather permitted, excavation for relocation of the highway proceeded intermittently. Reclamation contracted with the Mountain States Telephone Company and Public Service Company of Colorado for removal of utility lines from the reservoir area. Mountain States completed relocation of the telephone lines during the year. In a contract executed July 8, 1964, Reclamation and Public Service agreed to delay moving the power lines until after the contractor finished relocating the highway.(13) In the first act of 1965, on the project, Reclamation opened bids for construction of the Silt Pump Canal. Western States Construction Company submitted the low bid and on February 11, 1965, Reclamation awarded them the contract. Reclamation awarded the contract for construction/ rehabilitation of Davie Ditch, on April 30, 1965, to Crown Construction Company of Hot Springs, South Dakota; bids were opened April 6. Also in 1965, construction continued on Rifle Gap Dam. In April the contractor resumed work on the dam embankment and began excavation for the spillway as well as road relocation. In August, Lee Johnson, contractor for construction of the laboratory and field office, bid for and won the contract for construction of the Dry Elk Valley Lateral and rehabilitation of the Grass Valley Canal. Construction work began in September. Except for repeated flooding of excavation along the Silt Pump Canal by irrigators along the canal, work progressed steadily for the rest of the year.(14) In January of 1966, the contractor placed first stage concrete for the Rifle Gap Dam Intake Structure. Construction on the remaining outlet works continued, as did work on all other phases of project construction, satisfactorily through spring and early summer. The contractor essentially completed work on the Dry Elk Valley Lateral in May, while work on the Grass Valley Canal Rehabilitation was delayed; allowing the Farmers Irrigation Company use of the canal during the irrigation season. A rock slide problem developed in August along the relocated State Highway at Rifle Gap Dam. Necessitating remedial action an estimated 110,000 cubic yards of unclassified material required removal. The contractor essentially completed, except for some riprap, the dam embankment during the remainder of 1966. In the Silt Pumping Plant, all masonry work was completed. In addition, four pumps were installed and electrical installation of control boards was completed. Reclamation accepted as complete, on November 1, 1966, all work on the Dry Elk Valley Lateral and the Grass Valley Canal. The National Park Service (NPS) awarded a contract for construction of the Rifle Gap Reservoir boat ramp to GMCO Corporation of Grand Junction, Colorado, on August 1, 1966. Reclamation opened bids for the construction of Gaging Stations on Rifle Creek in December. They awarded the contract to Lee Johnson Construction Company on December 23. In a letter signed by David Crandall, Director Upper Colorado Region, Reclamation notified the Silt Water Conservancy District on June 27, 1966, that project water would be available for the 1968 irrigation season. The SWCD and Reclamation executed a repayment contract on June 24, 1963, amended on July 9, 1968, and December 20, 1984. The letter went on to say that the development period would begin January 1, 1968. Beginning with commencement of the development period, Reclamation anticipated that the SWCD would operate and maintain project facilities. An abandoned mine lease within the Rifle Gap Reservoir site caused considerable activity between June 24, 1966, and January 1, 1967. The Bureau of Land Management (BLM) began cancellation proceedings while the Bureau of Mines reported abandonment, during the latter part of 1966. These activities combined with construction of the relocated country road required for the Reservoir, led Henry Zieseniss, the lessee, to file suit for damages against Reclamation.(15) On June 23, 1967, United States district Judge Hatfield Chilson entered judgement against the United States for the amount of $1,200, at the same time declaring the Coal Lease in question to be forfeited. The relocated State Highway around Rifle Gap Dam and Reservoir opened in January of 1967, though paving operations were not complete until May. Also in January, Reclamation submitted the final contract summary and release to the contractor for the Silt Pump Canal. During the spring, contractors concentrated on electrical installation at Rifle Gap Dam as well as cleanup on Davie Ditch and the Silt Pumping Plant. The contractor completed work, in March, on the Rifle Creek Gaging Stations. Flash foods on two consecutive days in mid-July caused considerable damage to the East Rifle Creek Gaging Station, necessitating repairs which began immediately. In addition, in October, a sink hole developed on the Dry Elk Valley Lateral which required rehabilitation. Reclamation closed the Silt Construction Office on May 25, 1967. The Grand Junction Projects Office assumed control of all future business at the same time. The Silt Water Conservancy District held dedication ceremonies on September 8, 1967. The SWCD prepared and served a barbeque lunch. Speakers included Senator Gordon Allott, Representative Wayne Aspinall, Assistant Commissioner Newcomb Bennett, Felix Sparks, Governor Edwin Johnson, R. Eckles of the Colorado Department of Natural Resources, and M. Ryden, President, SWCD. Three months later on December 20, Dave Crandall, Director Upper Colorado Region, informed the District that they were to assume operational responsibility for the Project on January 1, 1968. Prior to transfer of the Project from construction to operation and maintenance status, Reclamation conducted an examination of the Project facilities. Most of the immediate problems discovered occurred in conjunction with the relocated State Highway. Subsidence in the uppermost portion of the downstream rock fill on the dam caused lateral cracking along the shoulder of the roadway pavement and misalignment of the guardrail. The contractor subsequently filled the cracks with crushed rock material. The Colorado Department of Highways, accepting all other portions of the relocated State Highway, agreed to make surface repairs and realign the guardrail the following spring. The State Highway had caused problems previously. During construction an extensive slide occurred. To fix the problem the contractor raised the road grade, placed a 10-foot berm against the toe of the slope, and installed 20-foot rock bolts in the undisturbed material on the slope. The contractor then covered the rock bolted area with wire mesh and a 1-inch covering of gunite. The area appeared to be stable during Reclamation`s inspection.(16) Reclamation encountered no other problems during their inspection and the Project was turned over to the SWCD for operation and maintenance January 1, 1968. Frank Carlson, Construction Engineer on the Project, on January 14, subsequently transferred to the Central Utah Project, Duchense, Utah. Reclamation appointed Herbert Stwalley, contracting officer`s representative, to oversee remaining work on the Silt Project and Rifle Substation. In addition to management of the Project, the SWCD also administers the exchange of water between the SWCD and the Farmers Irrigation Company.(17) Rifle Gap Dam, a zoned earthfill structure with a height of 157 feet, contains 1,768,000 cubic yards of material with a crest length of 1,450 feet. The Dam sits on Rifle Creek about five and one-half miles north of Rifle, Colorado, at the point where the creek cuts through the Grand Hogback. The resulting reservoir, Rifle Gap Reservoir, has a total capacity of 13,602 acre-feet and an active capacity of 12,168 acre-feet. The surface area covers 359 acres. The spillway structure consists of a short approach channel, concrete inlet walls, a concrete crest structure, and a concrete chute and stilling basin. The outlet works includes a concrete intake structure and a gate chamber with a six-foot long circular tunnel extending upstream and two 2.25-foot-square high pressure gates. The river outlet diverts the river to a six-foot-diameter flat-bottom free-flow tunnel downstream, which then discharges into the spillway stilling basin. Branching from the gate chamber a seven-foot diameter horseshoe tunnel contains a thirty-inch steel pipe which conveys water to a concrete pipe that in turn discharges into Davie Ditch. This Ditch, previously abandoned and rehabilitated by Reclamation as a part of the Silt Project, supplies irrigation water to Project lands on Davie Mesa. With a capacity of thirty-six cubic feet per second (cfs), the Silt Pumping Plant is located near the Colorado River about two miles east of the town of Silt. Extending northwest from the pumping plant discharge line, the 7.6 miles long Silt Pump Canal carries irrigation water to land on the lower portion of Harvey Mesa.(18) An apparent cultural shift occurred around 5,500 B.C., in response to changing climatic conditions. This shift was characterized by a gradual movement towards a more diversified economy. Population increased as did the use of floral and aquatic resources. The economic base shifted again after 1 A.D., this time turning towards agriculture. In addition, these adapting peoples left behind ceramics and habitation structures.
Plan
Project water is stored in Rifle Gap Reservoir, formed by Rifle Gap Dam on Rifle Creek. Reservoir exchange releases are made from Rifle Creek to existing ditches to meet downstream irrigation needs. The water is released directly into Davie Ditch to supply water to project lands on Davie Mesa. The Dry Elk Valley lateral carries water from the Grass Valley Canal to lands in Dry Elk Valley. Harvey Gap Reservoir, which previously filled and emptied each year, now stores and regulates water for a longer irrigation season. The Silt Pumping Plant is located near the Colorado River about 2 miles east of the town of Silt. The 7.6-mile-long Silt Pump Canal, northwest from the pumping plant, carries irrigation water to lands on the lower portion of Harvey Mesa. The pumped water is used as a supplemental supply, or as a replacement supply, for project lands formerly irrigated with Colorado River water pumped at high cost from the Cactus Valley Ditch. It also is used as an exchange for nonproject water to replace Harvey Gap Reservoir water for project lands above the Silt Pump Canal. Rifle Gap Dam is about 5 1/2 miles north of Rifle, at a point where Rifle Creek cuts through the Grand Hogback. The dam is an earthfill structure with a spillway. Rifle Gap Reservoir has a total capacity of 13,602 acre-feet and an active capacity of 12,168 acre-feet, and when full, a surface area of 359 acres. Reclamation turned over the operation and maintenance of the Silt Project to the Silt Water Conservancy District in 1968. The district also operates the private Farmers Irrigation Company facilities as part of the project. Reservoir releases are also made to meet downstream diversion rights of nonproject lands. These releases allow additional diversions from East Rifle Creek upstream from the reservoir for project use. Delivered through Grass Valley Canal, this exchange water provides a full irrigation supply for new project lands and a supplemental supply to project lands previously irrigated from the privately-owned Harvey Gap Reservoir and Grass Valley Canal.
Other
Reed, Alan D. West Central Colorado Prehistoric Context. Denver: Colorado Historical Society, 1984.
Contact
Contact
Title: Area Office ManagerOrganization: Western Colorado Area Office - Grand Junction
Address: 445 W. Gunnison Ave., Suite 221
City: Grand Junction, CO 81501
Phone: 970-248-0600
Owner
Title: Public Affairs OfficerOrganization: Upper Colorado Regional Office
Address: 125 South State Street, Rm 7102
City: Salt Lake City, UT 84138-1102
Fax: 801-524-5499
Phone: 801-524-3774
Contact
Organization: Silt Water Conservancy DistrictAddress: PO Box 8
City: Silt, CO 81652
Fax: 970-243-4871
Phone: 970-876-2393