Yakima River Basin Water Enhancement Project

Home | Integrated Plan | 2010 Basin Study | 2009 Workgroup | IOP | Phase 1 | Phase 2 | Authorization


Preliminary Integrated Water Resource Management Plan and Associated Reports

Prepared by the 2009 Workgroup

03/2011 Technical Memoranda HTML
12/2009 FINAL: Preliminary Integrated Water Resource Management Plan for the Yakima River Basin PDF 2.2 mb
12/2009 DRAFT: Preliminary Integrated Water Resource Management Plan for the Yakima River Basin PDF 2.4 mb
Comments on the Draft Preliminary IWRMP
American Rivers Comment Letter PDF 22 kb
Rick Dieker Comment Letter PDF 95 kb
Roza Irrigation District Comment Letter PDF 31 kb
Endangered Species Coalition Comment Letter PDF 112 kb
Gifford Pinchot Task Force Comment Letter PDF 100 kb
YBFWRB Comment Letter PDF 121 kb
YBSA Comment Letter for the Draft Plan and Plan of Study 2010 PDF 52 kb
YBSA Comment Letter for the latest IWRMP PDF 94 kb
Brad Avy Comment Letter PDF 44 kb
Benton County Comments on Yakima River Basin Study PDF 83 kb

Contact

Wendy Christensen
(509) 573-8050
gchristensen@usbr.gov

Bureau of Reclamation
Pacific Northwest Region
Columbia-Cascades Area Office
1917 Marsh Road
Yakima, WA 98901-2058


Thomas Tebb
(509) 574-3989
Thomas.tebb@ecy.wa.gov

Director, Office of Columbia River
State of Washington
Department of Ecology
15 W. Yakima Ave, Ste 200
Yakima, WA 98902-3452


Last Updated12/14/17