With the addition of the new siphons in the East Low Canal, seven radial gate structures are necessary to help control the increased flow.


Lind Coulee Siphon No. 1 and Lind Coulee Wasteway Radial Gates Project
Operation of the Lind Coulee Gate No. 1 in the East Low Canal.

Operation of the Lind Coulee Gate No. 1 in the East Low Canal.

Reclamation’s Technical Service Center designed the new radial gate and hoists structures for the radial gates project. In 2016, the East Columbia Basin Irrigation District administered the contract for the purchase and fabrication of the gates, hoists, and control panels. The district also conducted the installation.

In 2019, Reclamation purchased the remaining five radial gates, hoists, and control panels. They are as follows:


Kansas Prairie No. 1 and Kansas Prairie No. 2 Radial Gates Project Installation of the Kansas Prairie No. 1 radial gate.

Installation of the Kansas Prairie No. 1 radial gate.

Reclamation administered the contract for the purchase and fabrication of the gates, hoists, and control panels. ECBID completed the installation of the gates and hoists in March 2022.

Warden Radial Gate Project
Construction crews are preparing to install the Warden Radial Gate.

Construction crews are preparing to install the Warden Radial Gate.

Reclamation orchestrated the contract for the purchase and fabrication of the gate, hoist, and control panel. ECBID finalized gate and hoist installation in March 2022.

EL71.5 Check Structure No. 1 and EL71.5 Check Structure No. 2 Radial Gates Project

The ECBID anticipates project completion during the 2023 winter season. New corbels are needed before the radial gates and hoists can be installed.