Benton Irrigation District Water Conservation Program Environmental Assessment

The Bureau of Reclamation has issued an environmental assessment and Finding of No Significant Impact for the Benton Irrigation District (BID) Water Conservation Program Feasibility Study.

The purpose of the conservation project is to make the BID system more efficient by moving the point of diversion 71 miles downstream where a pump station would be installed. The proposed project would completely abandon the existing system and replace it with a new pump-pressurized, buried pipeline distribution system.

Documents
10/2008 Benton Irrigation District Water Conservation Program Feasibility Study Environmental Assessment and FONSI PDF 890 kb


Contact

Candace McKinley
(509) 573-8020
cmckinley@usbr.gov

Bureau of Reclamation
Columbia-Cascades Area Office
1917 Marsh Road
Yakima WA 98901-2058


Last Updated: 4/19/23