Boardman to Hemingway Transmission Line Project Record of Decision

The Bureau of Reclamation, acting as a cooperating Federal Agency, has drafted a Boardman to Hemingway Transmission Line Project (B2H) Record of Decision (ROD). The Bureau of Land Management (BLM) was the lead Federal Agency for the Environmental Impact Statement (EIS) and their ROD was signed on November 17, 2017

Reclamation was a Cooperating Agency in the preparation of the Final EIS.

Documents
02/2018 Concurrence to Sign the Boardman to Hemingway Transmission Line Record of Decision PDF 1.16 mb
02/2018 Record of Decision for the Boardman to Hemingway Transmission Line Project Final EIS PDF 10.2 mb