News Release Archive

Reclamation releases environmental documents for Marble Beach Bank Stabilization project

Media Contact: Lynne Brougher, (509) 633-9503, lbrougher@usbr.gov
Erika Lopez, 208-378-5101, ealopez@usbr.gov

For Release: October 30, 2018

Marble Beach Stabilization site.
Marble Beach Stabilization site.
GRAND COULEE, Wash. — The Bureau of Reclamation has issued the final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for a bank stabilization project at Marble Beach on Lake Roosevelt in Stevens County, Wash.

The project will stabilize the shoreline, halt bank erosion, and reduce the potential for exposure and loss of sensitive resources through the installation of a retaining wall using concrete blocks that would be reinforced with surface-treated riprap.

The final EA analyzed two actions: the Proposed Action (implementing the project, as described above) and a No Action alternative (non-implementation). Reclamation selected the proposed action for implementation.

The EA and FONSI were prepared in accordance with the National Environmental Policy Act and is available online at https://www.usbr.gov/pn/programs/ea/wash/marble/index.html. For more information or to request a copy, contact Ms. Rebecca Thompson, Project Manager, Bureau of Reclamation at 208-378-5191.

# # #

The Bureau of Reclamation is a federal agency under the U.S. Department of the Interior and is the nation's largest wholesale water supplier and second largest producer of hydroelectric power. Our facilities also provide substantial flood control, recreation opportunities, and environmental benefits. Visit our website at https://www.usbr.gov and follow us on Twitter @USBR; Facebook @bureau.of.reclamation; LinkedIn @Bureau of Reclamation; Instagram @bureau_of_reclamation; and YouTube @reclamation.

Relevant Link:

https://www.usbr.gov/pn/programs/ea/wash/marble/index.html