Documents
Documents in portable document format (PDF) will need Adobe Acrobat Viewer to view.
For a hardcopy of complete report, please contact Louis Moore
Phase 1 Investigation Report, Initial Surface Storage Options Screening, October 2003
- Complete Report (minus technical appendices) (pdf - 5.6 MB)
- Cover/Table of Contents/Abbreviations and Acronyms (pdf - 465 KB)
- Executive Summary (pdf - 749 KB)
- Chapter 1 - Introduction (pdf - 1.2 MB)
- Chapter 2 - Existing and Future Conditions (pdf - 1.6 MB)
- Chapter 3 - Problems and Opportunities (pdf - 159 KB)
- Chapter 4 - Plan Formulation (pdf - 2.0 MB)
- Chapter 5 - Public Involvement During Phase I (pdf - 285 KB)
- Chapter 6 - Next Steps (pdf - 224 KB)
- Chapter 7 - List of Preparers (pdf - 164 KB)
- Chapter 8 - References (pdf - 143 KB)
- Chapter 9 - Glossary (pdf - 177 KB)
- List of Technical Appendices:
- Big Dry Creek Reservoir (pdf - 2.4 MB)
- Dinkey Creek Reservoir (pdf - 2.8 MB)
- Dry Creek Reservoir (pdf - 2.5 MB)
- Fine Gold Reservoir (pdf - 2.0 MB)
- Appendix A1(pdf - 824 KB)
- Appendix A2 (pdf - 7.9 MB)
- Appendix A3 through Appendix C (pdf - 3.9 MB)
- Appendix D through Appendix E (pdf - 1.9 MB)
- Friant Reservoir (pdf - 2.2 MB)
- Appendix A (pdf - 6.8 MB)
- Appendix B through Appendix E (pdf - 3.2 MB)
- Hungry Hollow Reservoir (pdf - 3.9 MB)
- Mill Creek Reservoir (pdf - 2.9 MB)
- Montgomery Reservoir:
- Cover through Appendix B (pdf - 4.5 MB)
- Appendix C (pdf - 165 KB)
- Raise Pine Flat Dam (pdf - 3.2 MB)
- Rodgers Crossing Reservoir (pdf - 3.2 MB)
- Temperance Flat (pdf - 2.3 MB)
- Appendix A1 (pdf - 811 KB)
- Appendix A2 (pdf - 15.2 MB)
- Appendix A3 through Appendix B2-B (pdf - 5.6 MB)
- Appendix B2-C through Appendix C (pdf - 7.2 MB)
- Appendix D (Part 1) (pdf - 5.5 MB)
- Appendix D (Part 2) (pdf - 7.9 MB)
- Appendix E (pdf - 89 KB)
- Yokohl (pdf - 991 KB)
- Appendix A-C (pdf - 1.5 MB)
- Complete Phase I Report (minus the Technical Appendices) (pdf - 5.8 MB)
Last updated on: 03/13/2018 17:07:41