- Reclamation
- California-Great Basin
- Area Offices
- SCCAO
- Upper San Joaquin River Basin Storage Investigation
- Documents
- Initial Alternatives Information Report
Initial Alternatives Information Report, June 2005
- Complete Report (minus technical appendices) (PDF - 13.5 MB)
- Cover/Table of Contents/Abbreviations and Acronyms (PDF - 366 KB)
- Executive Summary (PDF - 716 KB)
- Chapter 1- Introduction (PDF - 988 KB)
- Chapter 2 - Related Studies, Projects, and Programs (PDF - 874 KB)
- Chapter 3 - Without-Project Conditions (PDF - 3.5 MB)
- Chapter 4 - Problems, Needs, and Opportunities (PDF - 193 KB)
- Chapter 5 - Plan Formulation Approach (PDF - 219 KB)
- Chapter 6 - Resources Management Measures (PDF - 4.3 MB)
- Chapter 7 - Initial Alternatives (PDF - 306 KB)
- Chapter 8 - Public and Agency Involvement (PDF - 216 KB)
- Chapter 9 - Next Steps and Key Issues (PDF - 202 KB)
- Chapter 10 - List of Preparers (PDF - 126 KB)
- Chapter 11 - References (PDF - 152 KB)
- Chapter 12 - Glossary (PDF - 177 KB)
- Attachment A - Special Status Species Potentially Present in the Study Area (PDF - 93 KB)
- Attachment B - Special Status Species and Habitat Descriptions (PDF - 865 KB)
- List of Appendices:
- Volume I - Engineering Technical Appendix (PDF - 2.8 MB)
- Attachment A - Seismic Hazard Analysis (PDF - 1.1 MB)
- Attachment B - Drawings (PDF - 10 KB)
- Attachment B1 - Cross Section Profiles, Temperance Flat and Fine Gold Dam Options (PDF - 342 KB)
- Attachment B2 - Cross Section Profile, Friant Dam Enlargement (PDF - 32 KB)
- Attachment B3 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 274 (PDF - 3.2 MB)
- Attachment B4 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 279 (PDF - 4.8 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (PDF - 4.1 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (continued) (PDF - 3.6 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (continued) (PDF - 1.8 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (continued) (PDF - 1.9 MB)
- Attachment B6 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Fine Gold Reservoir (PDF - 1.8 MB)
- Attachment C - Cost Estimate Worksheets + Attachment C1 - Component Summary Worksheets and Common Costs (PDF - 3.9 MB)
- Attachment C1 - Component Summary Worksheets and Common Costs (continued) (PDF - 3.6 MB)
- Attachment C2 - Cost Estimate Worksheets, Raise Friant Dam (Chapter 2) (PDF - 57 KB)
- Attachment C3 - Cost Estimate Worksheets, Temperance Flat Reservoir at RM 274 (PDF - 132 KB)
- Attachment C4 - Cost Estimate Worksheets, Temperance Flat Reservoir at RM 279 (Chapter 4) (PDF - 142 KB)
- Attachment C5 - Cost Estimate Worksheets, Temperance Flat Reservoir at RM 286 (Chapter 5) (PDF - 526 KB)
- Attachment C6 - Cost Estimate Worksheets, Fine Gold Reservoir (Chapter 6) (PDF - 69 KB)
- Attachment C7 - Cost Estimate Worksheets, Yokohl Valley Reservoir (Chapter 7) (PDF - 31 KB)
- Attachment D - Probable Maximum Flood Study (PDF - 1.7 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (PDF - 1.8 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (continued) (PDF - 3.1 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (continued) (PDF - 2.1 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (continued) (PDF - 4.2 MB)
- Volume II - Hydropower Technical Appendix (PDF - 3.9 MB)
- Volume II - Water Operations Technical Appendix (PDF - 1.5 MB)
- Volume II - Flood Damage Reduction Technical Appendix (PDF - 1.9 MB)
- Volume I - Engineering Technical Appendix (PDF - 2.8 MB)
Last Updated: 12/31/19