- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
| Title: | East Side Road Fuelwood Reduction Project, Lake Berryessa |
|---|---|
| Tracking Number: | CGB-ED-2025-040 |
| Progress: | COMPLETED |
| Summary: | The Bureau of Reclamation proposes to perform fuel reduction activities on Federal land along the east side of Lake Berryessa that includes various methods strategically implemented to mitigate fire risk and promote a resilient ecosystem. |
|
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
|---|---|---|---|---|
| Kris Edwards | 707-966-2111 x113 | N/A | kedwards@usbr.gov |
| 12/15/2025 | Final Environmental Assessment and Finding of No Significant Impact posted on 12/15/2025. |
|---|---|
| 08/15/2025 | Draft Environmental Assessment posted for public review through 9/15/25. |
| File | Report Title | File Ext | File Size |
|---|---|---|---|
![]() |
CGB-ED-2025-040 East Side Road Fuelwood Reduction Project, Lake Berryessa FONSI | 240,662 B | |
![]() |
CGB-ED-2025-040 East Side Fuelwood Reduction Project, Lake Berryessa Final EA | 1,044,226 B | |
![]() |
CGB-ED-2025-040 East Side Road Fuelwood Reduction Project, Lake Berryessa Draft EA | 862,046 B |


