Project Details
Title: California Aqueduct San Luis Canal Geotechnical Investigations Project CGB-EA-2021-038
Tracking Number:
Progress:
Summary: In coordination with Reclamation, the California Department of Water Resources is proposing to perform geotechnical investigations along the San Luis Canal embankments of Pools 17, 18, 20 and 21, within adjacent borrow sites, near abandoned utility pipelines and specified bridges. The proposed geotechnical investigations would inform the design of the San Luis Canal Embankment and Liner Raise Project, which would address subsidence by restoring the capacity of Pools 17, 18, 20 and 21 from Milepost (MP) 122 to MP 143 and MP 155 to MP 172 of the San Luis Canal portion of the California Aqueduct in Fresno and Kings Counties.
Contact
Phone
Fax
E-Mail
Notes
Rain Emerson 559-262-0335 N/A remerson@usbr.gov
Status
09/02/2021Final EA/FONSI posted.
07/09/2021Draft EA available for review on July 9, 2021. Comments due August 9, 2021
List of Available Reports
File Report Title File Ext File Size
California Aqueduct San Luis Canal Geotechnical Investigations Project - Finding of No Significant Impact .pdf 416,823 B
California Aqueduct San Luis Canal Geotechnical Investigations Project - Final Environmental Assessment .pdf 40,836,856 B
California Aqueduct San Luis Canal Geotechnical Investigations Project Draft EA .pdf 1,824,736 B
Appendix A California Aqueduct San Luis Canal Geotechnical Investigations Project .pdf 3,754,640 B
Appendix B California Aqueduct San Luis Canal Geotechnical Investigations Project .pdf 482,905 B
Appendix C California Aqueduct San Luis Canal Geotechnical Investigations Project .pdf 28,926,935 B
Appendix D California Aqueduct San Luis Canal Geotechnical Investigations Project .pdf 277,034 B