- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | San Joaquin River Exchange Contractors Water Authority Return of Transferred Water |
---|---|
Summary: | In order to better manage available water supplies, especially during drought conditions, the San Joaquin River Exchange Contractors Water Authority have requested authorization to return water from Reclamation-approved water banks that was transferred and/or exchanged under the 213 Water Transfer Program. Reclamation proposes to approve the annual return of up to 20,000 AF of either previously transferred CVP and/or future banked CVP water from Reclamation-acknowledged water banks over a 9 year period (through December 2026). |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Kate Connor | 559-262-0337 | N/A | mconnor@usbr.gov |
09/05/2018 | Final documents posted. |
---|---|
06/29/2018 | Draft EA Posted, Available for public comment until COB July 30, 2018 |
File | Report Title | File Ext | File Size |
---|---|---|---|
![]() |
FONSI - San Joaquin River Exchange Contractors Water Authority Return of Transferred Water | 158,999 B | |
![]() |
Final EA - San Joaquin River Exchange Contractors Water Authority Return of Transferred Water | 1,626,476 B | |
![]() |
Draft FONSI, San Joaquin River Exchange Contractors Water Authority Return of Transferred Water | 109,632 B | |
![]() |
Draft EA, San Joaquin River Exchange Contractors Water Authority Return of Transferred Water | 278,198 B | |
![]() |
Draft EA Appendices, San Joaquin River Exchange Contractors Water Authority Return of Transferred Water | 42,677 B |