Project Details
Title: San Joaquin River Exchange Contractors Water Authority Return of Transferred Water
Summary: In order to better manage available water supplies, especially during drought conditions, the San Joaquin River Exchange Contractors Water Authority have requested authorization to return water from Reclamation-approved water banks that was transferred and/or exchanged under the 213 Water Transfer Program. Reclamation proposes to approve the annual return of up to 20,000 AF of either previously transferred CVP and/or future banked CVP water from Reclamation-acknowledged water banks over a 9 year period (through December 2026).
Contact
Phone
Fax
E-Mail
Notes
Kate Connor 559-262-0337 N/A mconnor@usbr.gov
Status
09/05/2018Final documents posted.
06/29/2018Draft EA Posted, Available for public comment until COB July 30, 2018
List of Available Reports
File Report Title File Ext File Size
FONSI - San Joaquin River Exchange Contractors Water Authority Return of Transferred Water .pdf 158,999 B
Final EA - San Joaquin River Exchange Contractors Water Authority Return of Transferred Water .pdf 1,626,476 B
Draft FONSI, San Joaquin River Exchange Contractors Water Authority Return of Transferred Water .pdf 109,632 B
Draft EA, San Joaquin River Exchange Contractors Water Authority Return of Transferred Water .pdf 278,198 B
Draft EA Appendices, San Joaquin River Exchange Contractors Water Authority Return of Transferred Water .pdf 42,677 B