- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | Pressure Reducing Valve SCADA Upgrades Project |
---|---|
Summary: | The South Tahoe Public Utilities District Water Distribution System is divided into 31 pressure zones. Many of these zones are fed by remote PRV Stations. The remote PRV Stations are generally located in buried vaults either in or adjacent to a roadway (Figure 1). The PRV stations do not have a power source and therefore, do not have any instrumentation that can be monitored remotely. STPUD is completely blind at 19 zones that are fed remote PRVs (with no other facilities feeding the zone). There is no flow meter to monitor water delivery into the zone for distribution. There are no pressure gauges to monitor damaging pressure transients (which are common in pressure-regulated zones) or to monitor breaks in the system for emergency response. The Proposed Action will install the necessary equipment at each 19 PRV Stations to allow for ?real-time? monitoring capabilities. The Proposed Action will improve the STPUD distribution system. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Nathaniel Martin | 916-978-6153 | N/A | nmartin@usbr.gov |
07/31/2018 | FONSI and Final EA posted. |
---|---|
07/09/2018 | Draft EA posted for public comment. Comments are due by COB 7/27/2018. |
File | Report Title | File Ext | File Size |
---|---|---|---|
![]() |
FONSI - Pressure Reducing Valve SCADA Upgrades Project - South Tahoe Public Utilities District | 205,581 B | |
![]() |
Final EA - Pressure Reducing Valve SCADA Upgrades Project - South Tahoe Public Utilities District | 3,708,265 B | |
![]() |
Draft EA - Pressure Reducing Valve SCADA Upgrades Project | 2,955,807 B |