- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | Transfer of Base Supply and Central Valley Project Water by Glenn-Colusa Irrigation District to the Colusa Drain Mutual Water Company |
---|---|
Summary: | Reclamation proposes to consent to the transfer of up to 45,000 acre-feet (AF) of water per year from Glenn-Colusa Irrigation District (GCID or District) to the Colusa Drain Mutual Water Company for a five-year term. Transfer requests would be fulfilled with a combination of Base Supply and Central Valley Project water, as defined in Contract No. 14-06-200-855A-R-1 (Contract 855A) between GCID and Reclamation. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Megan Simon | (530) 247-8513 | 530-275-2441 | msimon@usbr.gov |
04/30/2018 | FONSI Signed, Transfer of Base Supply and Central Valley Project Water by Glenn-Colusa Irrigation District to the Colusa Drain Mutual Water Company |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
FONSI, Transfer of Base Supply and Central Valley Project Water by Glenn-Colusa Irrigation District to the Colusa Drain Mutual Water Company | 165,649 B | ||
Final EA, Transfer of Base Supply and Central Valley Project Water by Glenn-Colusa Irrigation District to the Colusa Drain Mutual Water Company | 659,278 B |