Title: | Long-term Renewal of CVP Contracts - Sacramento River Division EA |
---|---|
Summary: | The Sacramento River Division contains 18 water service contractors served primarily by the Tehama Colusa Canal and the Corning Canal in Tehama, Glenn, Colusa, and Yolo Counties. Potential impacts may be associated with potential changes in water use and cropping patterns,reduction of return flows,and availability of water.The contractor must ensure that all surface water delivered for irrigation purposes within the contractor's service area will be measured at each agricultural turnout, and water delivered for M&I purposes will be measured at each M&I service connection. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|
02/28/2005 | Draft EA on 8/19/03. BA completed August 2003. Revised BA March 2004. Revised Draft EA released on July 30, 2004. Final EA completed November 11, 2004. FONSI signed February 25, 2005. PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
Signed FONSI, Sac.River Division | 195 B | ||
Summary, contents, purpose & need - final EA, Sac. River Division | 267 B | ||
Figure 1-1, Final EA, Sac. River Division | 2,066 B | ||
Project Description, Affected Environ. and Environ. Consequences, Consult./Coord., References, Glossary, Final EA, Sac. River Division | 1,553 B | ||
Appendices A - F, Final EA, Sac. River Division | 2,799 B | ||
Appendix G, Final EA, Sac. River Division | 1,577 B | ||
NOAA Fisheries ESA Consultation letter 1/10/05, Sacramento River Division | 238 B | ||
FWS ESA Consultation letter 10/17/04 | 49 B | ||
FWS ESA Consultation letter 11/12/04 | 41 B | ||
FWS ESA Consultation letter 2/14/05 | 32 B | ||
FWS ESA Consultation letter 2/15/05 | 43 B |