- Reclamation
- California Great Basin Region
- NEPA
- Lahontan Basin Area
- Project Detail
Title: | Advanced Metering Infrastructure (AMI) System - South Tahoe Public Utilities District |
---|---|
Tracking Number: | |
Progress: | |
Summary: | The Proposed Action involves installation of AMI for Phase 3 and part of Phase 4 in the STPUD service area. Phase 3 involves the installation of 1,432 water meters and Phase 4 involves the installation of 1,327 water meters. Metering in the STPUD service area will allow STPUD to meter volumetric consumption, and better determine district water allocation. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Nathaniel Martin | 916-978-6153 | N/A | nmartin@usbr.gov |
04/17/2017 | Signed FONSI and Final EA posted. |
---|---|
03/16/2017 | Draft EA available for public review. Comments due 4/7/2017. |
File | Report Title | File Ext | File Size |
---|---|---|---|
![]() |
Signed FONSI - Advanced Metering Infrastructure (AMI) System | 109,570 B | |
![]() |
FINAL EA - Advanced Metering Infrastructure (AMI) System | 1,680,481 B | |
![]() |
Advanced Metering Infrastructure (AMI) System - South Tahoe Public Utilities District | 1,131,986 B |