Documents
Documents in portable document format (PDF) will need Adobe Acrobat Viewer to view.
For a hardcopy of complete report, please contact Louis Moore
Initial Alternatives Information Report, June 2005
- Complete Report (minus technical appendices) (pdf - 13.5 MB)
- Cover/Table of Contents/Abbreviations and Acronyms (366 KB)
- Executive Summary (716 KB)
- Chapter 1- Introduction (988 KB)
- Chapter 2 - Related Studies, Projects, and Programs (874 KB)
- Chapter 3 - Without-Project Conditions (3.5 MB)
- Chapter 4 - Problems, Needs, and Opportunities (193 KB)
- Chapter 5 - Plan Formulation Approach (219 KB)
- Chapter 6 - Resources Management Measures (4.3 MB)
- Chapter 7 - Initial Alternatives (306 KB)
- Chapter 8 - Public and Agency Involvement (216 KB)
- Chapter 9 - Next Steps and Key Issues (202 KB)
- Chapter 10 - List of Preparers (126 KB)
- Chapter 11 - References (152 KB)
- Chapter 12 - Glossary (177 KB)
- Attachment A - Special Status Species Potentially Present in the Study Area (93 KB)
- Attachment B - Special Status Species and Habitat Descriptions (865 KB)
- List of Appendices:
- Volume I - Engineering Technical Appendix (2.8 MB)
- Attachment A - Seismic Hazard Analysis (1.1 MB)
- Attachment B - Drawings - (10 KB)
- Attachment B1 - Cross Section Profiles, Temperance Flat and Fine Gold Dam Options (342 KB)
- Attachment B2 - Cross Section Profile, Friant Dam Enlargement (32 KB)
- Attachment B3 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 274 (3.2 MB)
- Attachment B4 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 279 (4.8 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (4.1 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (continued) (3.6 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features,Temperance Flat Reservoir RM 286 (continued) (1.8 MB)
- Attachment B5 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Temperance Flat Reservoir RM 286 (continued) (1.9 MB)
- Attachment B6 - Preliminary Design Layouts for Dam Structures and Appurtenant Features, Fine Gold Reservoir (1.8 MB)
- Attachment C - Cost Estimate Worksheets + Attachment C1 - Component Summary Worksheets and Common Costs (3.9 MB)
- Attachment C1 - Component Summary Worksheets and Common Costs (continued) (3.6 MB)
- Attachment C2 - Cost Estimate Worksheets, Raise Friant Dam (Chapter 2) (57 KB)
- Attachment C3 - Cost Estimate Worksheets, Temperance Flat Reservoir at RM 274 (132 KB)
- Attachment C4 - Cost Estimate Worksheets, Temperance Flat Reservoir at RM 279 (Chapter 4) (142 KB)
- Attachment C5 - Cost Estimate Worksheets, Temperance Flat Reservoir at RM 286 (Chapter 5) (526 KB)
- Attachment C6 - Cost Estimate Worksheets, Fine Gold Reservoir (Chapter 6) (69 KB)
- Attachment C7 - Cost Estimate Worksheets, Yokohl Valley Reservoir (Chapter 7) (31 KB)
- Attachment D - Probable Maximum Flood Study (1.7 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (1.8 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (continued) (3.1 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (continued) (2.1 MB)
- Attachment E - Geologic Drilling Investigation, Fine Gold and RM286 Dam Sites (continued) (4.2 MB)
- Volume II - Hydropower Technical Appendix (3.9 MB)
- Volume II - Water Operations Technical Appendix (1.5 MB)
- Volume II - Flood Damage Reduction Technical Appendix (1.9 MB)
- Volume I - Engineering Technical Appendix (2.8 MB)